Download presentation
Presentation is loading. Please wait.
1
De-Watering CBM and Shale
3
Contributors Boots Rouen Schlumberger Ray Hawk Weatherford
Garold Muth Muth Pumps Mike Reisz El Paso Dennis Wilson Conoco/Phillips
4
ALS Selection Determining Factors
Depth Casing Size Volume of Fluid Power Source Deviation Solids CO2 Temperature Open Hole or Cased Rat Hole
5
Primary Forms of Lift Beam Lift PC Pumps ESP’s Plunger Lift Gas Lift
Diaphragm Pumps Chemicals Vortex
6
ALS Percentage of Use in CBM
ESP’s 58% Beam Lift 25% PCP’s 16% Other 1%
7
Excluding PRB ESP’s Beam Lift 60% PCP’s 36% ESP’s 3% Other 1%
8
Optimization Proper Equipment Selection Tracking FAT Teams
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.