Presentation is loading. Please wait.

Presentation is loading. Please wait.

Performance Management System (PMS) (Department of Public Enterprises)

Similar presentations


Presentation on theme: "Performance Management System (PMS) (Department of Public Enterprises)"— Presentation transcript:

1 Performance Management System (PMS) (Department of Public Enterprises)
Workshop on Performance Management System (PMS) & Performance Related Pay (PRP) ******* (Department of Public Enterprises) Govt. of India Visakhapatnam

2 2007 Pay Revision : Background
Constitution of the II PRC in November, 2006 Headed by Justice M.J. Rao, retired Supreme Court Judge Committee gave its recommendations in May, 08 Some recommendations not accepted DPE O.Ms dated & Appointment of Committee of Ministers (Chidambaram Committee) DPE O.M dated

3 PRP in 1997 pay revision Out of 5% ‘Distributable Profit’ for the entire CPSE as a whole Freedom to the management to decide the amount each individual should get Total PRP to be paid to all the employees including workmen not to exceed 5% ‘Distributable Profit’ PLI ideally to be part of Perks & Allowances. However, if it is not sufficient it could be paid as PRP Problems in PRP system in 1997 pay revision

4 Paradigm shift in PRP/PMS in 2007 Pay Revision
DPE O.Ms dated & lay down transparent method for calculation of incentive w.e.f for all executives and Non-Unionised supervisors of CPSEs. O.Ms provide for PRP is linked directly to the profits of the CPSE and performance of the executive. PRP progressively increases with level of the executive.

5 PRP determinants Profit of CPSE
Grade of Executives (E0 – 40% to CMD(A) 200%) MoU rating of CPSE (Excellent – 100% to poor – 0%) PAR rating of Executive (Excellent – 100% to poor - 0% in a system based on PMS) Remuneration Committee

6 Profit of the CPSE and PRP
PRP will come out of profits of the CPSE 60% of the PRP will be within ceiling of 3% of Profit before Tax (PBT) 40% of PRP from 10% of incremental profit as compared to previous year’s profit The total PRP, however, will be limited to 5% of the year’s PBT, both for executives and non unionized supervisors The PRP for the year will be calculated latest by December of the following year, based on the CPSE’s performance as per audited accounts The proposed PRP scheme will begin w.e.f. financial year

7 Maximum PRP for different Grades
% of Basic Pay E0 to E3 40 E4 to E5 50 E6 to E7 60 E8 to E9 70 Director (C&D) 100 Director(A&B) & CMD(C&D) 150 CMD(A&B) 200

8 PRP & MoU Each CPSE to sign the MoU.
MoU rating will form the basis of PRP. All the key Result Areas to be identified in the MoU. CPSEs not executing MoU will not be eligible for PRP.

9 PRP based on MoU rating CPSEs rating %age of PRP for Executives
Excellent 100 Very Good 80 Good 60 Fair 40 No PRP for ‘Poor’ rating

10 PMS - DPE Guidelines (26.11.2008) CPSEs to adopt ‘Bell Curve Approach’
Not more than 15% of executives to be graded as “Outstanding” 10% of executives to be graded as “Below Par”. PMS to be introduced latest by Between and till a PMS is in place, existing guidelines on PRP, (which is limited to 5% of distributable profit will be applicable)

11 PRP and Performance Based on PMS
PMS Rating PRP Excellent At 100% eligibility levels Very Good 80% Good 60% Fair 40% Poor 0%

12 Remuneration Committee
Each CPSE to have Professional Boards with Independent Directors. CPSE to constitute a Remuneration Committee headed by an Independent Director. No PRP, if there are no Independent Director on the Board of the CPSE. Remuneration Committee will decide the annual bonus/variable pay pool and policy for its distribution across Executives and Non Unionised Supervisors.

13 Amount of PRP from current and Incremental Profit
Basic Pay X MoU rating X PAR 60% will be from current years PBT 40% will be from incremental profit Depending on availability of funds, the PRP would be paid proportionately

14 Annual Performance Reports
DPE issues guidelines for writing Annual Confidential Reports for top management (Chief Executives, Directors and 2 levels below Board). Earlier guidelines issued in 2005. Earlier separate formats for Chief Executives and Directors.

15 Salient Features of New Guidelines
Common format for Chief Executives, Directors, Executive Directors (E9) and General Managers (E8). Assessment based on MOU performance of company, Individual targets flowing from MOU and Personal attributes and functional competencies and differential weight to these aspects. Detailed time schedule prescribed. Clear channel of submission of PAR prescribed. Provision of strict monitoring of PAR process.

16 Salient Features of New Guidelines (contd.)
Provision of numerical grading for the purpose of objectivity Clear description of Personal Attributes, Functional Competencies and Benchmarking of assigning grades. Aspects such as Medical examination, annual property return, training programmes attended, additional qualifications acquired, etc. included in PAR.

17 Salient Features of New Guidelines (contd.)
Grading to follow Bell Curve approach. Nomination of nodal officer both in CPSEs and Ministries. Designation of PAR Repository Authorities to keep PARs in their custody. While prescribed PAR form, guidelines and procedure to be treated as Core elements, Boards of CPSEs authorized to supplement the contents of PAR under intimation to DPE. Oversight of Performance Appraisal exercise by DPE.

18 Individual targets flowing from MoU Targets
DPE guidelines have further concretized the Performance Appraisal System for E 8 and above. CPSEs are expected to do this exercise for other levels. Weightage MoU Targets Individual targets flowing from MoU Targets Personal Attributes and functional competencies Total What is being Assessed Designation Company Unit Individual Chief Executive 75 25 100 Functional Director 40 35 EDs(E9) & GMs (E8) 50

19 Why Performance Management System ?
What is measured well is managed well Bring objectivity, fairness, transparency in assessment (Build Credibility of process) Harmonize individual, group and Company goals Recognize & Incentivise superior Performance Motivate employees for superior performance From each, to the best of his/her ability 19 19

20 Thank you DPE Website : www.dpe.nic.in
Link to DPE pay related guidelines : Contact details in case of any query on salary/wage related matters. Shri Rajendra Kumar, Director, DPE Telefax : Shri P.J. Michael, Under Secretary, DPE Tele : Thank you


Download ppt "Performance Management System (PMS) (Department of Public Enterprises)"

Similar presentations


Ads by Google