SE 12th Street Roadway Improvements February 8, 2005
2
PROJECT LOCATION N 26 331 E. UNIVERSITY AVENUE SE 12th STREET
SE 1st AVENUE SE 11th STREET SE 2nd AVENUE
3
Widen roadway and improve condition of pavement
PROJECT PURPOSE Widen roadway and improve condition of pavement Improve pedestrian access, movement and safety Address residential flooding problems Improve water quality of Rosewood Branch
4
DESIGN ELEMENTS Reconstruction/widening of SE 12th Street
Addition of curb & gutter and storm drain system Sidewalk and ADA-compliant ramps Paved driveway entrances Parking reconfiguration in commercial area Construction of stormwater pond Rosewood Branch stream bank stabilization
5
PROPOSED IMPROVEMENTS N 26 Roadway widened from 20’ to 24’
E. UNIVERSITY AVENUE 26 Roadway widened from 20’ to 24’ Curb & gutter and storm drain system Paved driveway entrances at all existing locations 6’ sidewalk along west side of roadway for entire street length 8’ sidewalk and parallel parking along east side of street in front of commercial area Utility relocations Stormwater management (SWM) pond south of SE 2nd Avenue for water quality Grade and stabilize stream banks south of SE 2nd Avenue 8’ SIDEWALK PARKING SE 1st AVENUE SE 12th STREET 6’ SIDEWALK SE 2nd AVENUE SWM POND STREAM WORK
6
ROADWAY TYPICAL SECTION
Existing Roadway Proposed Typical Section
7
SE 12th STREET - Looking Towards SE 2ND Avenue
Existing Conditions Artist’s Rendering
8
SE 2nd AVENUE AT SE 12TH STREET (Looking East)
Existing Conditions Artist’s Rendering
9
SE 12th STREET AT SE 2nd AVENUE (Looking North)
Existing Conditions Artist’s Rendering
10
SE 12th STREET - Looking At East University Avenue
Existing Conditions Artist’s Rendering
11
ROSEWOOD BRANCH STREAM WORK
New endwall Stabilize stream banks Lay back slopes Revegetation Erosion Protection Reforestation
12
Minimize disruptions to residents and businesses
CONSTRUCTION GOALS Minimize disruptions to residents and businesses Keep all impacts within City right-of-way Grading for sidewalk Driveway entrance tie-ins Maintain one lane of traffic at all times during construction Road to be closed to through traffic Access for local residents only Maintain access to all residential/commercial driveways/entrances Complete construction as quickly as possible
13
PROJECT SCHEDULE DATE ACTIVITY JANUARY 2005 PRELIMINARY DESIGN PLANS
COMPLETED FEBRUARY 2005 PUBLIC MEETING APRIL 2005 FINAL DESIGN PLANS COMPLETED SUMMER 2005 BEGIN CONSTRUCTION DECEMBER 2005 FINISH CONSTRUCTION We Are Here