Eastbank Road, Brgy. Sta. Lucia, Pasig City
Manggahan Residence I Eastbank Road, Brgy. Sta. Lucia, Pasig City
2
PROJECT PROFILE
3
PHASE I SITE DEVELOPMENT PLAN
Floodway Talipapa ORTIGAS AVE. EAST BANK ROAD MANGGAHAN FLOODWAY PHASE I WESTBANK ROAD LRB 1 JAVIER BRIDGE LOKASYON LRB 2 PASUKAN/LABASAN LRB 1 PHASE I SITE DEVELOPMENT PLAN
4
LOW-RISE BUILDINGS BUILDING 1 BUILDING 2
5
MGA DETALYE Pinturado ang loob at labas ng gusali
Yunit pabahay para sa PWD (isa kada gusali) Structural I-beams/ cladding Palabas na pader ay gawa sa CHB 6” Panloob na pader ay gawa sa CHB 4” Pinturadong steel railings
6
WATER TANKS ROOF DECK AREA FOR ELEVATED WATER TANKS MGA DETALYE CISTERN / PUMPHOUSE Elevated Water Tank na may kapasidad na 2,460 gal. kada gusali 11,250 gal. Cistern Tank na may 5.5 HP transfer pump at stand-by pump (1 kada gusali)
7
IBA PANG PASILIDAD Sewerage Treatment Plant (STP) w/ 125kva Stand-by Generator located at Phase 2 Parking lots (184 slots) Main Gate 6 streetlights for Phase I Open space PWD ramps Vehicular parking Sementadong daan SEPTIC TANK – (BLDG 2)
8
HALLWAY STAIR LANDING STAIRS EXTERIOR STAIR LANDING
9
Isometric Bare Unit HALLWAY Unit Area kada yunit:
4.00m. X 6.00m. (24.00sq.m.) Suplay ng Kuryente: MERALCO Suplay ng tubig: Manila Water MGA DETALYE: Kitchen counter Kanya-kanyang metro ng tubig at kuryente Stove outlet, etc. HALLWAY
10
Suggested Layout Perspective
11
HALLWAY AFSS PIPES TYPICAL 24 sq.m. MODEL UNIT