Presentation is loading. Please wait.

Presentation is loading. Please wait.

NGV SG Closing Report – Hawaii, USA

Similar presentations


Presentation on theme: "NGV SG Closing Report – Hawaii, USA"— Presentation transcript:

1 NGV SG Closing Report – Hawaii, USA
May 2018 doc.: IEEE /0980r0 Sep 2018 NGV SG Closing Report – Hawaii, USA Date: Authors: Bo Sun (ZTE) Jon Rosdahl, Qualcomm

2 May 2018 doc.: IEEE /0980r0 Sep 2018 Abstract Closing report for Sep 2018 NGV SG meeting in Big Island, Hawaii, USA Bo Sun (ZTE) Jon Rosdahl, Qualcomm

3 NGV SG Progress Sep 2018 Meeting Slot #1 - Monday, AM2 10:30 – 12:30
Meeting Slot #2 - Tuesday, PM1 8:00-10:00 Meeting Slot #3 - Wednesday, AM1 8:00-10:00 Meeting Slot #4 - Thursday, AM1 16:00-20:00, cancelled Work items completed in this week: The group agreed on the minutes of Jul meeting and Aug CC. The group agreed on PAR proposal (11-18/0861r8) to be submitted to WG for approval The group agreed on CSD proposal (11-18/0862r3) to be submitted to WG for approval The NGV SG timeline plan is not changed. Teleconference plan before Nov meeting was settled, on Oct 16th 6 submissions on topics of use cases, channel model and technical feasibility were presented and discussed. Bo Sun (ZTE)

4 Submissions from the week
Sep 2018 Submissions from the week Submissions 11-18/1457, Items for completing the PAR, Michael Fischer (NXP) 11-18/1480, V2X Simulation Model, Ioannis Sarris (u-blox) 11-18/1535, Error Correction Message, Yossi Shaul (Autotalks) 11-18/1553, Doppler Impact on OFDM Numerology for NGV, Rui Cao (Marvell) 11-18/1577, Additional Details About Interoperable NGV PHY Improvements, Michael Fischer (NXP) 11-18/1598, Use case for Aerial Vehicle ITS, Jinson Ahn (Yonsei University) 11-18/1541, Railway Use Cases for NGV, Stephan Sand (German Aerospace Center (DLR)) Official SG documents PAR: /0861r8, approved by SG CSD: /0862r3, approved by SG Use Cases: /1323r1, approved by SG Liaison: /1303r2, approved by SG and WG Bo Sun (ZTE)

5 Sep 2018 Next Steps Telecon: Oct 16, 10:00am ~ 12:00am ET (to be confirmed by WG) Goal For November: In case the motion fails in WG Improve PAR and CSD in case the motion passes Process potential comments from EC regarding PAR/CSD. Any other submission on topic of use cases, channel models, technical feasibility and functional requirements, etc. Bo Sun (ZTE)


Download ppt "NGV SG Closing Report – Hawaii, USA"

Similar presentations


Ads by Google