Introduction OMB, 18-12-2012 T. Ferrari/EGI.eu 12/4/2018
Introduction to OMB,
2
Wiki Documentation Navigation of documentation being made easier (also through better navigation menus) Administrators: Users: (in progress) Comments: operations at egi.eu or GGUS ticket 12/4/2018 Introduction to OMB,
3
PROC16: update of decommissioning of unsupported software
Approved at the Nov OMB Various comments for improvements In case of site which fail to provide feedback and do not put Service Endpoints (SE) in downtime, ROD is requested to add a SE scheduled downtime (earlier: suspension) suspension only if tickets reach the COD escalation step steps split into Preparation phase and Escalation phase timelines for Escalation steps added some steps split to make them more clear 12/4/2018 Introduction to OMB,
4
PROC04 Verification of monthly Availability/Reliability statistics no longer handled through monthly tickets opened by COD since Nov Underperformance in the last 30 calendar days detected by operations portal probe Alarm displayed in case of under performance ROD is responsible of opening ticket New procedure reflected in PROC04 Please provide feedback to COD/OMB in case of problem with the current A/R probe implementation tuning may be needed (see presentation at the Nov OMB) 12/4/2018 Introduction to OMB,
5
A/R reporting Top-BDII reports: Site monthly reports (pdf monthly report). Pdf reports will be still uploaded on document DB after validation/recomputation Report EGI Profile ROC_CRITICAL EGI.eu operations tools and NGI SAM VO OPS Profile OPS_MONITOR_CRITICAL Sites e.g. GRIDOPS-GOCDB (sites are hosted by the EGI.eu operations centre in GOCDB) 12/4/2018 Introduction to OMB,
6
Changes in A/R computation
A/R of a RC that is certified in the course of the month or decommissioned (hence in scheduled down time) Monthly A/R statistics include sites suspended during the previous month. A site suspended after 5 days with 0% availability during those days contribute to the average values as it was in production for the whole month, its contribution is weighted on the cores, but not on the number of days in production. Proposal: exclude sites that during the month experienced one of the following transitions uncertified certified and Certified suspended 12/4/2018 Introduction to OMB,
7
EGI.eu OLA https://documents.egi.eu/document/1093
Few changes from November A few services removed Ticket triage and assignment (no longer a service separated from 1st and 2nd level support) Security Incident Response (communication based on exchanges difficult quantitative measurement) targets relaxed for software support to keep them in-line with the old DMSU practice: 1st, 2nd and 3rd Level Support accroding to Maximum response time Top priority: immediate within support hours Very urgent: within 8 support hours Urgent: within 16 support hours Less Urgent: within 40 support hours Please provide feedback by Jan OMB, approval of EGI.eu OLA in case of no comments received 12/4/2018 Introduction to OMB,
8
GGUS ticket handling New policy under discussion: close as unsolved tickets for which after several reminders no reply is provided from the submitter See discussion at When ticket set in "waiting for reply" + 5 WDs reminder to the user If no user answer + 5 WDs 2nd reminder to the user If no user answer + 5 WDs ticket automatically set to status "unsolved" (total of 15 WDs) unsolved + 10 WDs ticket automatically set to status "closed" (total of 25 WDs!) Drawback: requires careful usage of “waiting for reply” GGUS team monitoring Please circulate your comments by the Jan OMB to the mailing list 12/4/2018 Introduction to OMB,
9
Support to new RCs and NGIs
Problem: support to emerging RC administrators and NGIs with little experience Two new for a subforum created – moderated by COD (sso account required): sites NGIs Please advertise this in case of new RC administrators with little familiarity with tools, procedures and software installation 12/4/2018 Introduction to OMB,
10
Nagios probe AB Kickoff the Nagios Probe Advisory Board under COD coordination Proposal Invite ARC-based NGIs to participate to provide feedback about the current ARC probes Indicate 1 expert per NGI Denmark, Estonia, Finland, Latvia, Lithuania, Slovenia, Sweden, Switzerland, Ukraine Doodle: 12/4/2018 Introduction to OMB,
11
Mini projects Use of EGI-InSPIRE underspent funds to support supplemental activities that accelerate EGI's strategic goals around Community & Coordination, Operational Infrastructure and establishing Virtual Research Environments 12 month duration Deadline for submission: for SHORT (4 page) project proposals. Questions relating to these mini-projects (administrative and technical): Organisations within EGI-InSPIRE (or it JRUs) will be eligible for funding Ideas SAM extensions for regionalized A/R computations Operations Portal extensions Activities around resource allocation Accounting 12/4/2018 Introduction to OMB,
12
Issues for Jan OMB Operations plan 2013 Resource allocation procedures
Installation of software at sites Yaim core will not supported after EMI (April 2013) What is the experience with puppet and other configuration systems? Preferences/recommendations from NGIs? 12/4/2018 Introduction to OMB,
13
Audio-conferencing EVO evolving into a pay per service from Jan 2013
Replacement still being evaluated Proposal Usage of AdobeConnect as interim solution OMB testing session on Jan (details will be availble on indico) 12/4/2018 Introduction to OMB,