1 Accredited Standards Committee C63® - EMC
Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair 5/10/2017

2 Accredited Standards Committee C63® - EMC
SC1 Techniques and Developments Scope As assigned by the Main Committee ASC C63®, subcommittee 1 provides the technical expertise and resources necessary for newly proposed and maintaining existing C63® standards and documents. New or existing measurement methods, site qualification methods, calibration methods, and associated instrumentation are incorporated.

3 Subcommittee 1 Membership Roster
Chair Vice Chair Secretary Chen, Zhong Hodes, Harry O’Neil, Janet (non-voting) Name Role within SC Affiliation Antola, Mike Member Honeywell Arthurs, Mark Sony Chen, Zhong Chair ETS-Lindgren DeLisi, Bob UL LLC Dickten, Thomas GC Consulting Elliott, William (Mac) TÜV SÜD America, Inc. Griffin, Andy CISCO Systems Harrington, Tim FCC Heirman, Don Don HEIRMAN Consultants Hodes, Harry Vice-Chair Bay Area Compliance Laboratories Corp. Hofmann, Bob Honorary Member Hofmann EMC Engineering Hoolihan, Dan Hoolihan EMC Consulting Jones, Steve FCC Laboratory Kiemel, Greg Element Materials Technology Klinger, Jeff Compatible Electronics, Inc. Kramer, Doug Kuczynski, Victor Vican Electronics Lombardi, Rick Visteon Corporation / SAE Primary Long, Randy ANSI-ASQ National Accreditation Board d.b.a Laboratory Accreditation Bureau Nixon, Jason Innovation, Science and Economic Development Canada O’Neil, Janet Secretary O’Dwyer, Michael Apple, Inc. Potts, Nate Keysight Technologies Samoto, Mits Liberty Labs Asia Schaefer, Werner Schaefer Associates Schaefer, David TUV SUD Sigouin, Dan DHS-EMC Silberberg, Jeffrey L. FDA Center for Devices and Radiological Health Waitt, David Consultant Wall, Art Radio Regulatory Consultants / TCB Council Ward, Dennis PCTEST Engineering Laboratory Whitesell, Steve Whitesell Consulting / TIA Zainal, Khairul LS Research Zimmerman, Dave Spectrum EMC, LLC

4 Duties C Learn more Electromagnetic Interference and Field Strength Measuring Instrumentation in the Frequency Range 9 kHz to 40 GHz SC 1 Schaefer, Werner No active PINS Published in 2016. C Emission measurements Heirman, Don C63.4 PINS Published in 2014; PINS for next full revision approved. High priority items in PINS C63.4a-draft Limited Amendment to modify Annex D and correct certain equations C63.4a PINS Published 10/17/17. C Antenna Calibration Kramer, Doug C63.5 PINS 2017 edition published - site requirements as in CISPR C Corr Learn more Antenna Calibration Corrigendum 1 C63.5corr.1 PINS Under development. C Learn more Guide for Construction of Test Sites for Performing Radiated Emission Measurements SC 1 Heirman, Don No active PINS Published 9 March 2015 C Learn more Guide for Automated Electromagnetic Interference Measurements SC 1 Schaefer, Werner No active PINS Current. No plans for further maintenance at this time. C Measurement Uncertainty Nixon, Jason C PINS 2012 edition current--not under revision C63.25-draft Learn more Test Site validation time domain SC 1 Sigouin, Dan C63.25 PINS New standard. Draft being written. C draft Validation Methods for Radiated Emission Test Sites, 1 GHz to 18 GHz C PINS New standard under preparation C draft Validation Methods for Radiated Emission Test Sites, 30 MHz to 1 GHz C PINS New standard. Draft being written

5 Motion Motion to approve the scope, membership and duties

6 C63.4 Full Revision Chair: Don Heirman

7 Background At November 2016 WG meeting, three teams were formed for certain clauses: Team 1 (Clauses 1 to 5)—Heirman leader Team 2 (Clauses 6 to 11)-Popovici leader Team 3 (Clauses 12 & annexes)-Harrington Started with checking the use of “shall” and “should” for normative/informative PINS approved in November 2017

8 Process Continue aggressive schedule and work
Leadership team formed among team leaders Teams hold webinars approximately monthly Maintained sequence of team webinars (roughly one week apart) so that work starts with the cover page and advances through the end of the last annex Already in 2018, nine 2-hour webinars held in (18 hours of deliberations) Presently close to 95 percent completed

9 Summary Presented “mashed up” draft to date and discussed further changes as needed. Included consideration of all interpretations Prepare draft to ballot probably by next C63 meeting timeframe Target publication in 2019

10 C63.25 Chaired by: Dan Sigouin

11 Accredited Standards Committee C63® - EMC
C63.25 WG C Draft (above 1 GHz) is now at the balloting stage Balloting group has been formed (18) C (30 MHz to 1 GHz) PINS is current

12 Accredited Standards Committee C63® - EMC
C63.25 WG Family of C63.25 standards: C (1 GHz to 18 GHz) SVSWR/TD SVSWR C (30 MHz to 1 GHz) NSA Future plan for above 18 GHz C (30 MHz to 1 GHz) PINS is current Work on C will begin once C is published

13 C63.5 WG STATUS UPDATE Chaired by Doug Kramer

14 C63.5 Status Corrigendum Balloted, comments received and addressed
Will go back out for 14-day balloting period per IEEE Work on next edition Defining requirements for sites (SIGNIFICANT debate) Loop update Time gating clarification General edits Trying to get a draft for WG review by end of November

15 C63.23 C63.23 is currently 5 years old. There is an active PINS (Jason Nixon), but no active working group. SC1 motions that C63.23 – 2012 Measurement Uncertainties be reaffirmed without change

16 C63.4 Corrigendum Chaired by David Zimmerman
Motion to approve the PINS for C63.4 Corrigendum

17 Interpretation requests
There are 5 recent interpretation requests 2 have been approved by main committee and posted