Presentation is loading. Please wait.

Presentation is loading. Please wait.

A review of CCA23 John Huddleston 27 April 2007.

Similar presentations


Presentation on theme: "A review of CCA23 John Huddleston 27 April 2007."— Presentation transcript:

1 A review of CCA23 John Huddleston 27 April 2007

2 Operation Pre February 2007 CCA10 submission
Submission of CCA23 Annex 1 data Further guidance on CHP CCA10 submission Calculation at facility level Calculation at sector level

3 Sector correction for trading and double counting
R146 is ‘=SUMPRODUCT(R13:R133,N13:N133)’

4 Results No of TUs involved 139+ No of sectors involved 23
Net amount of EU allowances (EUA) in corrections 3,634,000 causing a tightening in CCA targets Total EUA resulting in an easing of targets 198,000 Total EU resulting in a tightening of targets 3,832,000 Number of TUs cancelling allowances to avoid a double counting correction 4 Allowances cancelled 46,000

5 Results - TUs and size of target changes

6 Results CO2 by percentage change

7 Results – pass/ fail by TU indication
To be advised

8 Conclusions The CCA23 approach provided an accurate method of correcting for double counting With further guidance, if the CCA23 method is used for future milestones, the process will be much smoother.


Download ppt "A review of CCA23 John Huddleston 27 April 2007."

Similar presentations


Ads by Google