Presentation is loading. Please wait.

Presentation is loading. Please wait.

2018 ACEA Annual Conference

Similar presentations


Presentation on theme: "2018 ACEA Annual Conference"— Presentation transcript:

1 2018 ACEA Annual Conference
May 9-10, 2018 Orange Beach, AL James F Boyer, P.E. Assistant State Local Transportation Engineer - Operations

2 Bridge Inspection Compliance Reviews
Office Review and Field Review Questionnaire and Bridge Folders Posting signs, Elements, Condition Grades / States All Counties in Troy, Grove Hill, and Mobile Areas MUST fill out Questionnaire….

3 Bridge Inspection Compliance Reviews
Troy Area – May 2th at 9:00 am Office / Field Reviews Henry County Houston County Crenshaw County Barbour County BrM Reviews Dale, Coffee, Geneva, Covington, Pike

4 Bridge Inspection Compliance Reviews
Grove Hill Area – June 13st at 9:00 am Office / Field Reviews Washington County Wilcox County BrM Reviews Marengo, Monroe, Choctaw, Clarke

5 Bridge Inspection Compliance Reviews
Mobile Area – July 11th at 9:00 am Office / Field Reviews Baldwin County Conecuh County BrM Reviews Mobile, Escambia

6 Bridge Inspection Issues
Top 3 Issues….. Bridge Folder Paperwork! Organization Closed Bridges! Keep them Closed Posting Signs! Incorrect signs

7 Bridge Inspection Refresher Training (2 Day Bridge Schools)
O pelika – October 17th – 18h Tuscaloosa – October 30th – 31th Huntsville – November 14th – 15th Mobile – November 28th – 29th ALDOT Section Updates BrM Updates / Issues Class Exercises Field Exercises

8 NHI Classes 2 Week Bridge School
Montgomery – September 24th – October 5th 2018

9

10 Bridge Preservation Class
Bridge Preservation for Local Agencies Local Transportation Memo National Center for Bridge Preservation Specifically for Counties and Cities Agenda is Created for Specific States/Areas ALDOT Central Office - June 20th Every County has one guaranteed spot County Engineer or Assistant Engineer Must sign-up by May 14th – James

11 Bridge Preservation Class
How to start a program Importance of preservation Overall preservation Strategies Convincing local government Deck Maintenance Right Application at the Right Time Life Cycle Cost Savings Hydro-demolition Painting When and What Product Starting a Spot Painting Program

12 BrM Upgrade

13 BrM Upgrade

14 County Road Maintenance Inspections
Local Agency Road Maintenance Certification Policy (LAMC) - Replaces Annual County Road Maintenance Inspections Biennial Certification Letter (every two years) - Computer generated from CRMC database - Letter will list all active projects - Counties sign and return it to County Transportation Local Transportation Bureau adds / removes Projects Based on designated service life for each project type Automatic expiration date based on service life

15 County Road Maintenance Inspections
Counties are responsible for inspecting their own Projects - Grades based on the Guidelines for grading County Roads - Score of 70 or above is passing - Score of 69 or below is failing If a project has not been maintained to a satisfactory condition, then the county will be considered to in non-compliance and is subject to having their state/federal funds suspended at the discretion of the ALDOT Director

16

17 Bridge End Treatments Part of the HRRR Funds (Local Transportation Memo ) 90-10 Match Obligated by September 2019 Initial End Treatment Project Call was to Determine Scope of Work Statewide Work in Progress to Determine: Amount of Funding needed / available Application Process / Cost Estimates Project Selection

18 Assist State Local Trans Engineer - Operations
Questions? James F Boyer , P.E. Assist State Local Trans Engineer - Operations


Download ppt "2018 ACEA Annual Conference"

Similar presentations


Ads by Google