Automation Practice under Agile Software L10N Context
Pan Jian-Hua(Jonathan) HP Software G11N
2
Self Introduction 12 Years in SW L10N Industry
Skype: hppanjianhua GitHub: (Constructing!) 12 Years in SW L10N Industry Program/Project Management, Agile(Scrum), L10N tools, L10N Workflow Automation etc. Python, PowerShell, VBScript(VBA) programming. Linguistic Master (FuDan University) PMP certified (expired) /ITIL Foundation certified.
3
Session Goal Not About About
A “general” end-to-end solution to Agile L10N An innovative Automation framework About A case study How to adopt Agile mind-set and methodology in real Agile L10N life
4
Agenda Key Agile Concepts in My Eye What Agile L10N Means?
Automation = Formidable Enemy? Case Study Recap Q&A
5
Key Agile Concepts in My Eye
“Agile” Mind-Set and Methodology: “Business Value” consideration Do “Right” things; do things “Right” Remove “Waste” from process Simplify process and work step Continuous delivery for improvement Agile Software Dev and Test: Deliver “workable” software incrementally Agile Software L10N: Deliver “well localized” software incrementally
6
What Agile L10N Means? Automation on Software Translation Process.
Continuous Translation Delivery Mode: L10N drop alignment with RnD “Iteration” plan (Bi)Weekly pickup and delivery 2-3 days “on-demand” delivery L10N drop 1 L10N drop 2 L10N drop 3 Iteration 1 Iteration 2 Iteration 3 Iteration 4 Week1 Week2 Week3 Week4 Week5 Week6
7
Automation = Formidable Enemy?
Everyone can play Agile L10N Automation game! Prerequisite: Business Value Technical Feasibility Process Standardization Step Break-down
8
Automation = Formidable Enemy?
Methodology Business-Driven Scope Practical Technology Not Reinvent Wheel Bottom-To-Top Modularization (step-by-step) Integration (end-to-end) Workable then Better
9
Case Study: Fact Sheet BSM (Business Service Management, a Portfolio Product) Scope: 7 languages Translation Tool: SDL Passolo RnD: ~ 15 teams Vendors: 4 vendors Scenario: Continuous translation alignment with RnD iteration
10
Case Study: Challenges
3 days! pre-post 1 L10n drop! Total ~15 Passolo lpu project files ! Each component R&D works differently: 4 L10N file exchange ways! All manual work for L10n drop Preparation& Delivery Q: Where to Start?
11
Case Study: Business Value & Technical Feasibility Analysis
Manual : (pre) + 1(post) = 3 days/drop Traditional L10N: 3 * 4 = 12 days Agile L10N: * 14 = 42 days! Automation: ??? Technical Feasibility: Source Control Tool CLI (Command Line Interface), Passolo CLI plus Macro API, FTP (Python? VB Script? PowerShell?...)
12
Case Study: Standardization & Break down
RnD <-> G11N: L10N file exchange between RnD and G11N: StarTeam, Subversion(SVN) – HP, 3rd Party, FTP, Solution: SVN G11N <-> Vendor: L10N file exchange between G11N and Vendor: , FTP(Vendor), SVN(HP), Solution: FTP (HP)
13
Case Study: Standardization & Break down
BSM SW Translation Standard Process: Further Break-Down Step: SVN: check out, update, commit Passolo: update, export/import bundle, generate target file. FTP: initialize folder, upload, download RnD (SVN) G11N (Passolo) Vendor (FTP)
14
Case Study: Modularization and Bottom-up
SVN: check out (“Sparse Check-out” PowerShell script) NEW! update (“svn up” cmd) commit (“svn ci” cmd) Passolo: update (Passolo cmd) export/import bundle (Passolo Macro) NEW! generate target file (Passolo cmd) FTP: initialize folder, upload, download (MS DOS ftp cmd) Integration: “One-Click” pre (post) PowerShell script NEW!
15
SVN “Sparse Check-out” “One-Click” Pre(Post) Bundle Process
Case Study: Live Demo SVN “Sparse Check-out” “One-Click” Pre(Post) Bundle Process
16
Case Study: Final Result Summary
Manual vs Automation:
17
Case Study: Final Results Summary
“Well Localized” Software! Early Frequent Delivery Early Defect Detecting Early Defect Fixing Early Defect Verification
18
Case Study: It’s not yet the end...
Daily Monitor the Volume Change Auto-Translate and Auto-Check Automatic Drop Notification Status Reporting Dashboard Script GUI Support for Easy Configuration …
19
Recap Mandatory under Agile Business consideration
Standard process and break-down step Practical technology – not reinvent wheel Bottom-to-top Modularization then Integration Not “Silver Bullet” Evolutionary
20
Q&A Thank You !