Lean Six Sigma Green Belt Training Module 5 - “Control” Part 2
Lean Six Sigma Green Belt Training Module 5 - “Control” Part 2 January 2018 Jiri Benedikt Draft
2
D M A I C DMAIC project roadmap Define Measure Analyzuj Improve
1 2 3 4 5 D Define Define the improvement opportunities Develop the project plan Develop the project team Define the processes (high level) Identify critical customers requirements (CCR’s). 1 2 3 4 M Measure Identify the Key Performance Indicators (KPIs) Develop a data collection plan Validate the measurement system Define the baseline process performance 1 2 3 A Analyzuj Identify specific problems Identify and validate the root causes Identify y = f (x) 1 2 3 4 5 I Improve Identify potential solutions Select right improvement solution Test and validate optimal solutions Develop a change management approach Deploy and execute solutions 1 2 3 4 5 C Control Design the control system Implement solution and control plan Evaluate results of the changes Document the process changes Close project, communicate the know-how
3
Notes:
4
2. Implement a solution and a control plan
Before implementation, verify if selected solution/project is without any negative effects and successful. How can you verify it? - pilot - test, experiment - failure mode and effect analysis - six hats
5
Managing the change Control 1 2 3 4 5 Design the control system
Implement solution and control plan Evaluate results of the changes Document the process changes Close project, communicate the know-how Managing the change
6
People that help, people that won‘t
Control 1 2 3 4 5 Design the control system Implement solution and control plan Evaluate results of the changes Document the process changes Close project, communicate the know-how People that help, people that won‘t
7
Relation of people in your company towards a change project:
Control 1 2 3 4 5 Design the control system Implement solution and control plan Evaluate results of the changes Document the process changes Close project, communicate the know-how The golden rule of change management Relation of people in your company towards a change project: 10% 80% 10% Support Ignore Sabotage
8
Low interest (Blocker) High Interest (Supporter)
Control 1 2 3 4 5 Design the control system Implement solution and control plan Evaluate results of the changes Document the process changes Close project, communicate the know-how Stakeholder Analysis Low interest (Blocker) High Interest (Supporter) Keep satisfied Actively Engage High Power Monitor Keep informed Low Power
9
Stakeholder Analysis Example
Control 1 2 3 4 5 Design the control system Implement solution and control plan Evaluate results of the changes Document the process changes Close project, communicate the know-how Stakeholder Analysis Example
10
Communication plan addresses the stakeholders
Control 1 2 3 4 5 Design the control system Implement solution and control plan Evaluate results of the changes Document the process changes Close project, communicate the know-how Communication plan addresses the stakeholders Item Stakeholders Media /Frequency Responsible Content / Objective Project announcement Employees One time Kickoff Project team Streering Committee Project Sponsor(s) Monthly Status meeting Project Weekly Project newsletter .... 2x Monthly Bulletin board ... 1x monthly Google: Communication plan
11
D * V * F > R The Formula for change
Control 1 2 3 4 5 Design the control system Implement solution and control plan Evaluate results of the changes Document the process changes Close project, communicate the know-how The Formula for change D * V * F > R D = Dissatisfaction with how things are now; V = Vision of what is possible; F = First, concrete steps that can be taken towards the vision. If the product of these three factors is greater than R = Resistance, then change is possible. The formula for change was created by Richard Beckhard and David Gleicher and is sometimes called Gleicher's Formula. Three factors must be present for meaningful organizational change to take place
12
Control 1 2 3 4 5 Design the control system Implement solution and control plan Evaluate results of the changes Document the process changes Close project, communicate the know-how Key Message Change is always hard. Focus on opinion leaders. Communicate frequently.
13
Notes:
14
3. Evaluate results of the changes
Before implementation, verify if selected solution/project is without any negative effects and successful. How can you verify it? - pilot - test, experiment - failure mode and effect analysis - six hats
15
Performance: Data show if we do things right
Control 1 2 3 4 5 Determine the control plan Detect the abnormal variations Evaluate results of the changes Document the process changes Close project, communicate the know-how Performance: Data show if we do things right Customer Company „I’d like to have the product delivered the same day.” “What is the average delivery time?” “Did we improve?” Current state Future
16
Customer service calls / million bills % success of user testing
Control 1 2 3 4 5 Determine the control plan Detect the abnormal variations Evaluate results of the changes Document the process changes Close project, communicate the know-how The project KPI needs to show customer value, but also a clear link to profit Customer need „I need to understand my energy bill.” Metric Customer service calls / million bills nebo % success of user testing Vraťte se k příkladu restaurace a zjistěte, How do we benefit? - Leaving customers + Revenue - Retention costs + Profit - Cost - Customer phone calls
17
Financial benefits tracking for multiple projects
Control 1 2 3 4 5 Determine the control plan Detect the abnormal variations Evaluate results of the changes Document the process changes Close project, communicate the know-how Financial benefits tracking for multiple projects Nakreslit na flipchart
18
Notes:
19
4. Document the process changes
Before implementation, verify if selected solution/project is without any negative effects and successful. How can you verify it? - pilot - test, experiment - failure mode and effect analysis - six hats
20
"I did not know I was supposed to do it." "I thought he was doing it."
Control 1 2 3 4 5 Design the control system Implement solution and control plan Evaluate results of the changes Document the process changes Close project, communicate the know-how RACI matrix "I did not know I was supposed to do it." "I thought he was doing it." inefficient team work higher complexity of communication unwanted results at the end When more people work on a project, it happens that someone assumes that someone else will take care of a task. - I did not know I was supposed to do it. I thought he was working on it.
21
Control 1 2 3 4 5 Design the control system Implement solution and control plan Evaluate results of the changes Document the process changes Close project, communicate the know-how RACI matrix helps answer the following questions: Who is accountable for accomplishment? Who does execute it? Is there anybody whom we can consult activities with? Who does need to be informed about activities?
22
RACI is the abbreviation of four roles that stakeholders can play
Control 1 2 3 4 5 Design the control system Implement solution and control plan Evaluate results of the changes Document the process changes Close project, communicate the know-how RACI is the abbreviation of four roles that stakeholders can play R A C I
23
RACI matrix is a tool for assigning responsibilities
RACI matrix is a tool for assigning responsibilities R = responsible (performs the action) A = accountable (blamed if it fails / sponsor) – Only once in each line! C = consulted (gives opinion – two way communication) I = informed (one way communication) Production flow - dispatching Operator Shift leader Flow leader Dispatch leader Lean office Supply chain manager CFO Following the process R A I Updating the rules C Temporary changes of the rules A,R Communcating the temporary change Recording temporary changes Permanent rule change R I
24
Real life RACI
25
RACI matrix Example – Roles and responsibilities in LSS projects
Control 1 2 3 4 5 Design the control system Implement solution and control plan Evaluate results of the changes Document the process changes Close project, communicate the know-how RACI matrix Example – Roles and responsibilities in LSS projects
26
Control 1 2 3 4 5 Design the control system Implement solution and control plan Evaluate results of the changes Document the process changes Close project, communicate the know-how Key Message The RACI matrix simply defines what is expected from stakeholders and how to communicate with them.
27
5. Close project, communicate the know how
Before implementation, verify if selected solution/project is without any negative effects and successful. How can you verify it? - pilot - test, experiment - failure mode and effect analysis - six hats
28
We improvement something. How to keep it that way?
Control 1 2 3 4 5 Determine the control plan Detect the abnormal variations Evaluate results of the changes Document the process changes Close project, communicate the know-how We improvement something. How to keep it that way? Responsibilities Documentation Regular measurement of KPIs Introduce to reward schemes Sponsor approval Proving the benefit
29
3 1 2 What comes next? Current state Dream state Future state
Control 1 2 3 4 5 Determine the control plan Detect the abnormal variations Evaluate results of the changes Document the process changes Close project, communicate the know-how What comes next? 1 3 2 Current state Dream state Future state Proč první aktuální stav? Lepší poznání problému, řešíme správnou věc Proč je lepší začínat vysněným vstavem? Lidi se při přemýšlení omezují tím, jaké mají zdroje „What is the problem that we are have right now?“ „What can be achieved with the resourcees we have?“ „What can be achieved with the resourcees we have?“
30
Contact Jiří Benedikt Trainer, Consultant I help people work smarter
Lean Six Sigma | Design thinking | Excel