Pueblo Convention Center Expansion & Professional Bull Riders University (PCC-PBRU)
REQUEST FOR PROPOSALS FOR AN INTEGRATED PROJECT DELIVERY METHOD UTILIZING DESIGN/BUILD GUARANTEED MAXIMUM PRICE (GMP) SERVICES Pre-Proposal Meeting March 22, 2017
2
Welcome & Introductions
Opening Comments Jerry M. Pacheco PURA Executive Director
3
Context Today’s Agenda
Convention Center & PBR RFP Introduction Jerry M. Pacheco Urban Spaces, Enhancements & Riverwalk Bob Eck, ASLA Access, Circulation & Parking Bob Eck, ASLA Project Infrastructure & Engineering Greg Shaner, PE Questions & Discussion
4
Context RFP Schedule RFP Document Release 03/15/2017
Submittals Due 2:00 PM MST Short List Announced /18/2017 Oral Interviews of Short List & Review of Cost Proposals /25/ /26/2017 Selection Announced /28/2017 Contract Approval (projected) /16/2017
5
Property Ownership PROJECT AREA
6
Convention Center & PBR
Conceptual Site Layout and Perspective View
7
Convention Center & PBR
Program Elements: An addition to the PCC of approximately 30,500 gross square feet for pre-function and exhibit space built of a quality similar to, or better than, the existing convention center; and An addition to the PCC of approximately 18,000 gross square feet for the PBRU which includes an interactive “fan zone”; A minimum 500 space parking structure with skybridge connection between the parking structure and the Pueblo Convention Center (over Main Street)
8
Convention Center & PBR
Conceptual Floor Plan
9
Project Areas and Funding
CONVENTION CENTER RTA FUNDED PURA HARP/PCC EDA FUNDED HARP HOTEL SITE PRIVATE FUNDED PRIVATE CONSTRUCTION CHANNEL EXTENSION BALLOT 1A COUNTY/HARP MAIN ST ENHANCEMENTS COUNTY/PURA HARP ENHANCEMENTS LEVERT W HOAG ATTORNEY’S PLAYGROUND
10
Urban Spaces, Enhancements & Riverwalk
Plaza Urban Spaces Main Streetscape Plaza Walk of Valor Heritage Plaza Hotel Terraces Gateway Plaza Channel Extension Channel Extension
11
Access, Circulation & Parking
Vehicular Access I-25 1st Ave Exit (City Center Drive) Central Main Street Santa Fe Avenue Mechanic Street Alan Hamel Drive
12
Project Infrastructure & Engineering
Convention Center Expansion Wet Utility Infrastructure: Water Sewer Hotel
13
Project Infrastructure & Engineering
Section at Richmond Avenue Right-of-Way
14
Project Infrastructure & Engineering
Convention Center Expansion Dry Utility Infrastructure: Gas Electric Fiber Optic Telephone Hotel
15
Questions and Discussion
16
Thank You