Prepare SVOM BA with GWAC Events
Wei joint team, NAOC Paris, Oct. 20, 2016
2
Content A very short review
The propose: Prepare SVOM BA with GWAC Events The schedule (preliminary) Current status and the schedule of GWAC The schedule of SVOM/GWAC BA system
3
The strategy for SVOM to observe GW bursts
2015 2019 2022 Error box: ~600 Sq.Deg ~10 Sq.Deg. GRM Eclairs MXT VT GWAC SRR, June 2015, Beijing
4
Chinese and French Joint Teams
SVOM triggers GW triggers GWAC FSC GFTs CSC Telescopes Proposed this idea at JSC, 26 Sept., and discussed about it in IAP, 27 Sept. 2016
5
Main works for BA Scientific judgement of a burst
GRB validation mainly based on the VHF data Supervise the notice/circular/report To make the first circular for a given burst, which includes the information of all the instruments. To coordinate the follow-ups Notice: BA needs the supports from IS/IE/BAa From Liping’s talk for this workshop
6
BA for SVOM GRBs vs BA for GWAC OTs
Scientific judgement of a burst GRB validation mainly based on the VHF data Supervise the notice/circular/report To make the first circular for a given burst, which includes the information of all the instruments. To coordinate the follow-ups Notice: BA needs the supports from IS/IE/BAa Eclairs--->GRBs GWAC--->OTs GWAC OTs need the same tasks as Eclairs GRBs.
7
The Propose to SVOM ground segment teams
To prepare SVOM BA with GWAC events Design and build BA system; Test and refine the system; Train the BA team; Before the launch of SVOM, SVOM have a very mature BA system!
8
Status: Mini-GWAC Mini-GWAC at Xinglong Obs.: 12 CANON EF 85/f1.2
12 U9000X CCD cameras FoV: ~5000 Sq.Deg Having capability to trigger OT: Oct. 2015: in operation, ~10 flare stars detected, … 日 :a Flare star,Time scale~700秒 Light curve
9
A light curve of a flare star
Light curves of GRBs (Wang et al. 2013) A light curve of a flare star (Mini-GWAC 2015) T0 T-T0=30 sec Mini-GWAC GWAC 700sec
10
Status: GWAC 2014: GWAC working Model, 4 telescopes + one mount
2016: 8(Oct.)+10(Dec.) GWACs will be set up at Xinglong Obs.
11
Testing 8 GWACs, Fuzhou, July 28
10 GWACs more, Fuzhou, Sept. 23 4 GWAC on one mount, Nanjing, Sept 13
12
Status: GFTs for GWAC 2台60厘米望远镜:广西大学提供,2013年8月到货安装;
1台30厘米望远镜:淮北师范大学提供,2015年11月安装完毕 广西大学梁恩维教授及校领导(2015年) 30厘米望远镜(2015年)
13
Sept. 17, 2016
14
Sept. 19, 2016
15
The Schedule (preliminary)
GWAC : 8 cameras : +10 cameras : +22 cameras (TBD) SVOM/GWAC BA system ( for discussin) Design and proto system: Update and engineering system: Refine the BA system: