1
P17452 Dresser-Rand System Health Monitor System Level Design Review
Anthony Ballister Dylan Boberg Jehad Al Dabbous Matthias Galley Fernando Soto Andrew Gordon Matthias
2
Agenda Systems Architecture (2:00 - 2:03)
Functional Decomposition (2:04 - 2:10) Benchmarking (2:11 - 2:13) Concept Development (2:14 - 2:16) Morphological Charts (2:17 - 2:33) Concept Selection and Feasibility (2:34 - 2:50) Use Case Scenarios (2:51 - 2:54) Behavioral Charts (2:55 - 2:57) Risk Assessment (2:58 - 3:00) Plans for Next Phase (3:00 - 3:05) MAtthias
3
System Architecture Charts made by Fernando F. Soto
4
Functional Decomposition
Dylan
5
Comparison of other health monitoring systems
Benchmarking Comparison of other health monitoring systems Andrew Gordon Arduino is 2.7x2.1
6
Concept Development Selection Criteria:
Below are the criteria pulled from customer and engineering requirements that the components of the system should be chosen and compared to based on their individual capabilities. These selection criteria are: Data Transmission Rate Data Transfer Range Durability Ease of Execution of Programming Sampling Rate Easy to Use Latency of System Set-Up Compactness Storage Space/Memory Low Cost Accuracy/Precision of Samples Dylan
7
Morphological Chart Dylan
8
Concept Selection #1 (Datum)
Dylan - Data processing will be done on the receiving device instead of the processor.
9
Concept Selection #2 Dylan
10
Concept Selection #3 Dylan
11
Concept Selection #4 Dylan
12
Concept Selection Pugh Diagram
Overall Concept +/- of Concept Selections Anthony Ballister We have 4 major design concepts including our Datum Briefly go over applicable fields and their importance to the project
13
Concept Selection Hardware Interfacing Displaying the state of device
Mounting the device Jehad This is one of many various subsystems that is involved in our project. We are only showing one datum because it would take too much space to show the various datums, we have an excel spreadsheet that has all the different datum alterations. I’m not going to go through the selection criteria, I will mention that by just looking at the different options for displaying the state of the device. Visualizing alternating the datum it can be seen that the LED is the best option. The same can be said in regards to rubber feet for mounting the device.
14
Concept Selection Acquire data Accept data Protect device Matthias
15
Protection Feasibility
Matthias
16
Concept Selection Process measurements Final data storage
Database solution Anthony Ballister
17
Data Storage Feasibility
Anthony Ballister
18
Concept Selection Process measurements Process data Transmit data
Andrew Gordon
19
Transmission Feasibility
Andrew Gordon
20
Sampling Feasibility fernando
21
Concept Selection Display measurements Basic development process
Graphics library fernando
22
Concept Selection Power system Powering device Activate device Jehad
I’m not going to go through the selection criteria, I will mention that by just looking at the different options for Activating the device and visualizing alternating the datum it can be seen that either the button or slide switch are the best options. The same can be said in regards to AC power for powering the device.
23
Sensors Feasibility Jehad This leads into the next feasibility slide
24
Set-Up Feasibility Jehad
25
Use Case Scenarios Charts made by Fernando F. Soto
26
Behavioural Charts Charts made by Fernando F. Soto
27
Software planning fernando
28
Risk Management Jehad These are the risks involved in the project which we touched on during the last presentation, the only update that was made was in regards to the app development aspect of the project.
29
Plans for the Next Phase
• Determine wireless method • Determine final hardware inputs • Compile a bill of materials • Develop a set of tests to satisfy the engineering requirements • Look into PCB microcontroller design • Research application development tools • Investigate user friendly displays for the application • Determine final mobile platform for the application • Research robust packaging option and costs • Update team with all aspects of the project Anthony Ballister
30
Gantt Chart matthias