Download presentation
Presentation is loading. Please wait.
Published byGötz Adenauer Modified over 6 years ago
1
4.8 Determining the Bill-of- Material (Manual Estimate)
Once the take-off is complete, the next step is to determine the bill-of-material. ©MikeHolt.com
2
4.8 Determining the Bill-of- Material (Manual Estimate)
If you’re estimating manually, determining the bill-of-material requires the estimator to have the ability to visualize all of the material items needed for each symbol. ©MikeHolt.com
3
©MikeHolt.com
4
©MikeHolt.com
5
4.8 Determining the Bill-of- Material (Manual Estimate)
Material Spreadsheet. Manual estimates require the bill-of-material to be extracted from the take-off in the most efficient manner, which is the use of a spreadsheet. ©MikeHolt.com
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.