Presentation is loading. Please wait.

Presentation is loading. Please wait.

4.8 Determining the Bill-of- Material (Manual Estimate)

Similar presentations


Presentation on theme: "4.8 Determining the Bill-of- Material (Manual Estimate)"— Presentation transcript:

1 4.8 Determining the Bill-of- Material (Manual Estimate)
Once the take-off is complete, the next step is to determine the bill-of-material. ©MikeHolt.com

2 4.8 Determining the Bill-of- Material (Manual Estimate)
If you’re estimating manually, determining the bill-of-material requires the estimator to have the ability to visualize all of the material items needed for each symbol. ©MikeHolt.com

3 ©MikeHolt.com

4 ©MikeHolt.com

5 4.8 Determining the Bill-of- Material (Manual Estimate)
Material Spreadsheet. Manual estimates require the bill-of-material to be extracted from the take-off in the most efficient manner, which is the use of a spreadsheet. ©MikeHolt.com

6


Download ppt "4.8 Determining the Bill-of- Material (Manual Estimate)"

Similar presentations


Ads by Google