Download presentation
Presentation is loading. Please wait.
1
Abscission Registration Budget and Timeline
Citrus Harvesting Research Advisory Council May 16, 2006 Robin Bryant
2
Abscission Registration Timeline
3
Cost Estimate Process AgroSource submits estimate of each study prior to execution Bids are solicited from numerous laboratories AgroSource selects the best candidate based on cost and ability to execute Selected vendor and all other bids are submitted to FDOC for final review and approval Work is awarded
4
Studies Initiated Pre-Development Product Chemistry-Technical
Preliminary Analysis Technical Grade Active Ingredient Material Safety Data Sheets Product Chemistry-Technical CMNP Preparation Material Synthesis Product Chemistry-Formulated Metabolite Synthesis
5
Studies Initiated Residue Chemistry Environmental Fate Toxicology Data
Fractions Analytical Methods Orange Fractions GLP Orange Metabolism Environmental Fate Environmental Fate Studies Toxicology Data Acute Toxicology Studies Pilot Toxicology Studies Wildlife & Aquatic Data Wildlife and Aquatic Ecotoxicology
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.