Download presentation
Presentation is loading. Please wait.
Published byMelissa Mendes Silveira Modified over 6 years ago
1
Corridor Sketch Plan Methodology – Update
ITS Sketch Plans Corridor Sketch Plan Methodology – Update presented to Wisconsin Department of Transportation presented by Cambridge Systematics, Inc. and SRF, SEH, EK 10/22/07
2
Agenda Welcome and Introductions Schedule Corridor Updates Next Steps
Final report – Title Change Next Steps
4
Corridor Update
5
Corridor Updates Regional visit update Statewide smoothed dataset
Completed Positive Feedback Integrating Comments Statewide smoothed dataset Draft technology recommendation All corridors (signpost maps) Outstanding Issues Display issues Corridor connector issue
6
2030 Corridors Update 2030 Corridors Have Been Updated
Not Finalized – Pending Public Review Process Two New Backbone Routes Eight New Connector Routes Two New Backbone Routes USH 45 USH 14 Eight New Connector Routes USH 63 Wis 16 Wis 33 USH 151 Wis 57 Wis 310 Wis 47 DRAFT
7
Final Report
8
Final Report Outline Appendices SRF E&K SHE
9
Next Steps Integrate Region comments Finalize map displays
Finalize report outline Prioritize Corridors
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.