Download presentation
Presentation is loading. Please wait.
1
Antiproton decelerator
Layout p transformer or rack compressors for future pbar trap C5,6 R14 Antiproton decelerator 100KV R15 R16 R9 T R13 R10 R11 R12 C1,2 C3,4 Target and coils inside bunker R17 R1 R2 R3 R4 R5 R6 R7 R8 R18 Free fall detection being defined Net socket Compressed air outlets Cryo Compressor R19 R20 Electronic Rack W W E cool water distribution chillers and electrical cabinet for linac
2
P. Pérez / JM Reymond / JY Roussé
Water cooling 2/06/2016 P. Pérez / JM Reymond / JY Roussé
3
Power distribution P. Pérez 2/06/2016
4
P. Pérez / JM Reymond / JY Roussé
Buffer Gas at Saclay Water cooling distribution For the 7 coils and 2 solenoids 2/06/2016 P. Pérez / JM Reymond / JY Roussé
5
P. Pérez / JM Reymond / JY Roussé
Some questions Electrical CANALIS distribution: Is there electrical cabinets or boxes corresponding to each crate? Who pay for this installation? For antiproton décelerator: 100KV What are the Cern rules in matter of safety, distance….? Cable pathes: Does CERN install cable trays in the zone, along the peripheral walls? Gas: - LHelium line installed during LS2? - Possibility to have Nitrogen Bottles in the zone when working on vacuum vessel? - possibility to have small nitrogen flux in laser cover in laser hut? 2/06/2016 P. Pérez / JM Reymond / JY Roussé
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.