A Streetcar Rail-with-Trail in Edmonton
RIBBON OF STEEL A Streetcar Rail-with-Trail in Edmonton Claire Stock P.Eng. City of Edmonton
2
WHERE IS EDMONTON? Edmonton
Ribbon of Steel links existing HLB trail (west side) from 97 Avenue along abandoned CP Rail lands north to Jasper Avenue, plus connection to Railtown. Province owns CPR corridor triggering 1994 Agreement for City management, including development of a multi-use trail. Agreement expires 2014. City supports alternative modes of transportation (supporting policy documents next slide)
3
EDMONTON REGION Refer to MUTC Network handout.
Blue corridors = 62 km MUTC network Red connectors = 100 km secondary network (40 km existing, 60 km new). Note does not indicate all existing secondary routes or local routes. The corridor network will dramatically improve opportunities for non-motorized transportation and recreation during all seasons The realization being a more healthy, active population with a decreased reliance on cars as their primary mode of transportation
4
NORTH SASKATCHEWAN RIVER VALLEY
5
TOP OF BANK TRAILS
6
ROADWAY TREATMENTS 4.2 m 3.7 m
7
ROADWAY TREATMENTS
8
PIPELINE RIGHTS-OF-WAY
9
WINTER!!!
10
WINTER CONDITIONS
11
WINTER CONDITIONS
12
TRAIL CORRIDOR NETWORK
Refer to MUTC Network handout. Blue corridors = 62 km MUTC network Red connectors = 100 km secondary network (40 km existing, 60 km new). Note does not indicate all existing secondary routes or local routes. The corridor network will dramatically improve opportunities for non-motorized transportation and recreation during all seasons The realization being a more healthy, active population with a decreased reliance on cars as their primary mode of transportation
13
ROS PROJECT FEATURES CND$2.3 M Former rail lands
Adjacent land use is mixed River Valley and trails Historic streetcar extension Transit plus underground LRT At grade xings - safety audit Corridor beautification Refer to MUTC Network handout. Blue corridors = 62 km MUTC network Red connectors = 100 km secondary network (40 km existing, 60 km new). Note does not indicate all existing secondary routes or local routes. The corridor network will dramatically improve opportunities for non-motorized transportation and recreation during all seasons The realization being a more healthy, active population with a decreased reliance on cars as their primary mode of transportation CND$2.3 M
14
WEST ALONG 97 AVENUE Before & After
97 Avenue looking west to 110 Street and Ezio Farone Park. Before & After
15
SOUTH TO 97 AVENUE Before & After
97 Avenue looking west to 110 Street and Ezio Farone Park. Before & After
16
NORTH TO GRANDIN STOP Before & After
97 Avenue looking west to 110 Street and Ezio Farone Park. Before & After
17
GRANDIN STREETCAR STOP
97 Avenue looking west to 110 Street and Ezio Farone Park. Before & After
18
NORTH TO 99 AVENUE Before & After
97 Avenue looking west to 110 Street and Ezio Farone Park. Before & After
19
99 AVENUE OVERPASS West & East
97 Avenue looking west to 110 Street and Ezio Farone Park. West & East
20
SOUTH FROM 100 AVENUE Before & After
97 Avenue looking west to 110 Street and Ezio Farone Park. Before & After
21
100 AVENUE CROSSING Before & After
97 Avenue looking west to 110 Street and Ezio Farone Park. Before & After
22
JASPER TERMINUS Before & After
97 Avenue looking west to 110 Street and Ezio Farone Park. Before & After
25
claire.stock@ edmonton.ca
RIBBON OF STEEL Questions? edmonton.ca