Presentation is loading. Please wait.

Presentation is loading. Please wait.

In-Service Inspection German Experiences

Similar presentations


Presentation on theme: "In-Service Inspection German Experiences"— Presentation transcript:

1 In-Service Inspection German Experiences
F REISTAAT T HÜRINGEN Landesbetrieb für Arbeitsschutz und technischen Verbraucherschutz In-Service Inspection German Experiences Michael Borzel Thuringian Authority of Occupational Health and Safety Department of Technical Consumer Protection and Market Surveillance TAIEX- Workshop, Bucharest 27. Feb Mar. 2007

2 T O P I C S L e g i s l a t i o n E x p e r i e n c e G u i d e

3 L e g i s l a t i o n - Review Instructions for Manufacturing and Operation - instructions combined in one statuary ordinance - restrictive regulations for manufacturing - solid base for a fixed scope of in-service inspection

4 Scope of In-Service Inspection
- examination of the accompanying documents - check of the necessary equipment - are the conditions of placement in proper style Documen- tation Manometer Safety Valve Shut-off device Drain Nozzle

5 L e g i s l a t i o n - Review 10 years for the pressure test
Instructions for Manufacturing and Operation - fixed prescriptions for periodical examination 5 years for the check of the inside wall of the vessel 10 years for the pressure test

6 L e g i s l a t i o n - Today Ordinance Ordinance for for
Placing on the market Ordinance for Use / Operation

7 Time Limits in Comparison
D 5 L 5 NL 4 S 3 GB 2,17 F 1,5-3 B 1-3 I 1-2 years for the check of the internal surface of the vessel Source: VdTÜV

8 Scope of In-Service Inspection
- examination of the accompanying documents - (check of the necessary equipment) - conditions of placement (surroundings) Declaration of Conformity Instructions for Use

9 Scope of In-Service Inspection
c‘d - determination of inspection intervals confirmation by an approved body (P * V > 200 bar litres) max. intervals - 5 / 10 years !! Instructions for Use

10 Defining the Inspection Intervals
Instructions for Use direct from the manufacturer Examples: ... an inside corrosion test should be carried out at quarterly intervals. ... check the condition of the inside of the walls once a year. ... for maintenance and installation, the general technical rules are to be observed.

11 Defining the Inspection Intervals
c‘d 1 4 3 2 5 years quarterly once a year possible

12 The Guidance Design / Fabrication Documented Quality
- EC type-examination / certificate of adequacy - module G / Module B+D Documented Quality - design code, - wall thickness - corrosion allowance - ……

13 The Guidance Results of the In-Service Inspection
c‘d Results of the In-Service Inspection - equipment - conditions of placement Operating Conditions which influence lifetime - number of stress cycles - pressure pulsation - drainage

14 missing or incomplete documents
Implementation Advice first short - then longer periods Problems missing or incomplete documents poor workmanship

15

16 Thank you for your attention


Download ppt "In-Service Inspection German Experiences"

Similar presentations


Ads by Google