GLAST LAT System Engineering
Gamma-ray Large Area Space Telescope GLAST LAT System Engineering LAT Test Configurations Rich Baun SLAC (650)
2
Why Test Configurations?
LAT Level testing must, among other things, verify: The correct function of all LAT primary and redundant units The correct function of all interfaces between LAT primary units, LAT redundant units,and the Spacecraft The correct function of all copper paths within the LAT and from the LAT to the Spacecraft Provide at least 250 hours (TBD) of on time for each LAT unit Establishing Test Configurations accomplishes the verification of unit functions and their interfaces Configurations selected so that each unit and it’s prime, redundant, and cross-strapped interfaces are verified Sufficient testing performed in each configuration to verify the proper function of each unit Performance testing is done mainly in the all prime configuration Cross-strapped configurations have significantly fewer test procedures executed as only interfaces/copper paths are verified Test configurations minimize unit power cycles and provide test repeatability and configuration control LAT Level testing will require 6 separate configurations to verify all unit functions and interfaces (see next slide)
3
Proposed LAT Test Configurations
4
LAT Configurations vs. Interfaces Verified
Notes: SC-P indicates all primary SC-LAT electrical signals, excluding power feeds SC-R indicates all redundant SC-LAT electrical signals, excluding power feeds
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.