Presentation is loading. Please wait.

Presentation is loading. Please wait.

Test Bench for Serdes Radiation Qualification

Similar presentations


Presentation on theme: "Test Bench for Serdes Radiation Qualification"— Presentation transcript:

1 Test Bench for Serdes Radiation Qualification
A. Aloisio, R. Giordano University of Naples ‘Federico II’ and INFN XII SuperB Workshop - LAPP, Annecy - Mar. 18th, 2010

2 XII SuperB Workshop - LAPP, Annecy - Mar. 18th, 2010
Overview On-detector SerDes in the ETD framework Test boards for Rad Tests The full test bench Status and work plan Budget issues Conclusions XII SuperB Workshop - LAPP, Annecy - Mar. 18th, 2010 2

3 SerDes in rad enviroments
FCTS links: Timing & Clock Commands & Controls config data DATA links: Read-out payload DS92lv18: Fixed latency 1.2 Gbit/s FCTS and DATA TLK2711A Variable latency Up to 2.7 Gbit/s DATA only Layout by D. Breton LNF, Dec.09 FCTS link Tight latency requirements DS92lv18 Data link No tight latency requirements DS92lv18 or TLK2711A XII SuperB Workshop - LAPP, Annecy - Mar. 18th, 2010

4 XII SuperB Workshop - LAPP, Annecy - Mar. 18th, 2010
DS92LV18 Test board Diff. impedance 120 W High speed I/O and clocks on SMA connectors with controlled impedance RX, TX, Controls busses on parallel connectors with matched length and controlled impedance Static control programming enabled via jumpers Separate supplies for analog, digital, PLL with sense (4-wire scheme) Current sensing on each supply 10 layer PCB, separate power and ground planes TX clk TX out RX in Reference clk Recovered Clock 57 W XII SuperB Workshop - LAPP, Annecy - Mar. 18th, 2010

5 XII SuperB Workshop - LAPP, Annecy - Mar. 18th, 2010
TLK2711A Test Board TX clk TX out RX in Same logical and physical layout as DS92LV18 board RX, TX, Controls busses on parallel connectors with pinout as similar as possible to DS, yet quite different Separate supplies only for generic analog and digital sections (no PLL supply specified) Recovered Clock SERDES Controls Current sense & Test points XII SuperB Workshop - LAPP, Annecy - Mar. 18th, 2010

6 XII SuperB Workshop - LAPP, Annecy - Mar. 18th, 2010
Test Bench (DS92LV18) XILINX ML505 Tektronix DTG5334 Tektronix MSO70000 18 2 18 RX Data out 8 Controls Clock Generator FPGA Clk RX Reference Clk Recovered Clk TX Clk Jitter Analyzer TX Data in Power Analyzer Controls RX Serdes AGILENT E5052B TX Serdes 3.3V Power AGILENT N6705A XII SuperB Workshop - LAPP, Annecy - Mar. 18th, 2010

7 Errors and Loss-of-Service
presented at SLAC, Oct.09 Errors in the DS payload can be counted by a BER Tester Corruption of start/stop bits trigger a Loss-of-Service, LOCK needs to be monitored FEC coding can moderate error rate, NOT Loss-of-Service XII SuperB Workshop - LAPP, Annecy - Mar. 18th, 2010

8 XII SuperB Workshop - LAPP, Annecy - Mar. 18th, 2010
FPGA setup Clock input GTPdiff. I/O Clock output Virtex5 – XC5VLX50T XILINX ML505 Testing the SerDes RX section Drives the SerDes receiver input with serial stream, emulating the DS92LV18 protocol Receives DS92LV18 parallel output Cross check received data vs. transmitted Measure BER and loss-of-service Testing the SerDesTX section Drives the SerDes transmitter input with parallel data Receives the SerDes serial stream, emulating the DS92LV18 protocol Controls section Programs and checks controls bits Console Status and errors are flagged on a console via JTAG-over-USB and/or Ethernet handled by an embedded micro TX and RX sections of the SerDes are tested independently and simultaneosly XII SuperB Workshop - LAPP, Annecy - Mar. 18th, 2010

9 XII SuperB Workshop - LAPP, Annecy - Mar. 18th, 2010
TLK vs. DS presented at LNF, Dec.09 TLK2711A and DS92LV18 test boards are very similar … …however, chip-sets have different clock frequency, coding scheme, lock procedure and control handling FPGA firmware will be quite different XII SuperB Workshop - LAPP, Annecy - Mar. 18th, 2010

10 XII SuperB Workshop - LAPP, Annecy - Mar. 18th, 2010
Status and road-map PCBs have been designed in Nov./Dec. 09, received last week, assembled (1 board per type) and successfully tested 10 boards per SerDes will be used for rad tests (TID and SEU/SEL) FPGA firmware for DS testing is presently being developed, firmware for TLK will follow later Test bench ready in the lab, will be validated as soon as firmware will be available (2 months) LNS (Catania, Italy) call for proton beam allocation still on hold, expected around summer XII SuperB Workshop - LAPP, Annecy - Mar. 18th, 2010 10

11 XII SuperB Workshop - LAPP, Annecy - Mar. 18th, 2010
Budget Issues Funding from INFN CSN I: 1 k€ Bills till now: 10+10 PCBs: 2040 € + VAT Components for 20 boards: 4800 € + VAT (including SMA cables, connectors, …) We have got a loan from other groups, but we have to pay it down soon XII SuperB Workshop - LAPP, Annecy - Mar. 18th, 2010

12 XII SuperB Workshop - LAPP, Annecy - Mar. 18th, 2010
Conclusions Boards for TLK and DS evaluation have been developed and tested Test bench for Rad tests is presently under developments: power consumption, BER, Loss-of-Service waiting for beam time at LNS (at no cost) Q3/Q4 2010 XII SuperB Workshop - LAPP, Annecy - Mar. 18th, 2010


Download ppt "Test Bench for Serdes Radiation Qualification"

Similar presentations


Ads by Google