1 Vessel Operation System (VOS)
船舶營運監控管理系統 Vessel Operation System (VOS)

2 AGENDA Task Force Project Scope & Goal Project Effect & Benefit
System Structure and Display System improvement

3 TASK FORCE Director Project Manager LODP EMDP ITDP LGP EVP Keny Chou
IGP W.J. Chen Project Manager JVP CT Tun EMDP Paul Lin LODP Capt. Chao Capt. Li Capt. Tsrong ITDP AVP Sean Tsai KEVIN Su Vicky Ho Stanley Chien Owen Lin Scott Kuo

4 Quick response to abnormal situation
PROJECT SCOPE & GOAL Timely monitoring --Vessel Schedule --FOC (Fuel Oil Consumption) --Port Performance Cost saving Performance upgrading Competiability enhancing Quick response to abnormal situation

5 Information Integration
PROJECT EFFECT & BENEFIT Operations 1.Integrating ship-shore information 2.Timely exhibiting vessel/schedule status & FOC 3.Recording root course & rectification of abnormal situation for further performance analysis Resource Sharing 1.One stop management 2.Vesse schedule and FOC information 3.Performance of each calling port VOS Information Integration 1.Data centralization for easy query. 2.Information integration for better management System Development 1.Creating reports as users’ demand. 2.Bunker & FOC systemization

6 SYSTEM STRUCTURE–Ship-Shore Information
Sea Part: (P/S Last Port P/S Next Port) Maneuvering Part: (Departure  P/S or P/S Arrival) Terminal Part: (Arrival  Departure) Port A Port B Terminal Maneuvering Sea Maneuvering Terminal FA – Anchor or Drift for waiting berth FB – Berthing FC – Departure Report FD – Noon Report

7 SYSTEM STRUCTURE VOS web site :

8 SYSTEM STRUCTURE– Monitoring

9 SYSTEM STRUCTURE– Monitoring

10

11 REPORTS Port B Time Lost (A+B+C) A B C
Terminal Part: (Arrival  Departure) Approach Part: (Unberth  Pilot station or Pilot station  Berth) Sea Part: (Pilot station  Pilot station) Notes: * A = Time lost between Arrival and Pilot on Board * B = Time lost between 1st Line Ashore and Commence Cargo Operation * C = Time lost between Complete Cargo Operation and All Lines Case off Port A Port B Port C Terminal Departure Sea Approach Terminal Departure Sea Approach Terminal Port B Sea Approach Terminal Approach Sea Arrival Pilot In Berthing Commence Cargo Complete Cargo Unberthing Pilot Out

12 REPORTS Port Performance Management - Performance - Productivity - Rehandling Control - Berth Arrangement - Waiting Time Control FOC Management - Daily Fleets Bunker Consumption - Speed & Bunker Matrix - Noon Report Record

13 REPORTS--Performance Report

14 REPORTS – Productivity Report

15 REPORTS - Rehandling Control

16 REPORTS – Berth Arrangement Report

17 REPORTS – Waiting Time Control

18 ACHIEVEMENT Timely Monitoring vessel schedule and fuel consumption Quick response to abnormal situation Accurate record at once Resource sharing

19 FURTHER IMPROVEMENT VOS Promotion
FOC data supplement (at sea + in port) Final FOC calculation in same platform/source --Deck/Eng AB log --Voyage Sector AB log e-Bunkering --Bunker management --Bunker purchasing --Bunker hedging

20 FURTHER IMPROVEMENT VOS Objective -Voyage fuel cost estimation
Precisely final FOC calculation Data integration for reducing workload – Ship/Shore Monitor and control abnormal FOC FOC simulation -Voyage fuel cost estimation -Decision making for fuel purchasing

21 Q & A Thank You