Presentation is loading. Please wait.

Presentation is loading. Please wait.

Nov 2009 Closing Plenary Reports

Similar presentations


Presentation on theme: "Nov 2009 Closing Plenary Reports"— Presentation transcript:

1 802.11 Nov 2009 Closing Plenary Reports
May 2006 doc.: IEEE /0528r0 Nov 2009 Nov 2009 Closing Plenary Reports Date: Authors: Adrian Stephens, Intel Corporation Bruce Kraemer, Marvell

2 May 2006 doc.: IEEE /0528r0 Nov 2009 Abstract This document is a digest of the closing reports of all sub-groups for presentation at the Nov 2009 closing plenary meeting. Adrian Stephens, Intel Corporation Bruce Kraemer, Marvell

3 Agenda for 2009-11-17 Roll Call / Contacts / Reflector
Nov 2009 July 2007 May 2006 doc.: IEEE /0528r0 Nov 2009 Agenda for Roll Call / Contacts / Reflector Go round table and get brief status report Review action items from previous meeting Numbering Alignment process Amendment Ordering / ANA Status / Draft Snapshots Lessons learned from TGw/TGn RevCom Lessons learned from initial editing of TGn Style Guide for /1034r0 Conference Calls Adrian Stephens, Intel Corporation from slide 1/3 of 11-09/1110r2 (part) by Peter Ecclesine (Cisco Systems) Page 3 Bruce Kraemer, Marvell Peter Ecclesine (Cisco Systems)

4 Draft Development Snapshot
May 2006 July 2007 July 2009 doc.: IEEE /0528r0 Nov 2009 Nov 2009 Nov 2009 Draft Development Snapshot Most current doc shaded green. Changes from last report shown in red. TG Published or Draft Baseline Documents Source MEC Style Guide Editor Snapshot Date 802.11 k r y w n z p v u s mb aa 2007 2008 10.0 11.0 6.0 Word Yes Menzo Wentink 17-July 5.0 9.0 Frame 7.2 2009 Wayne Fisher 2-Nov 7.03 No Emily Qi 18-Nov 7.0 8.0 Necati Canpolat 4.0 6.01 5.01 3.04 Frame 8.0 Kazuyuki Sakoda , pro-tem 2007 Inc 2008 Inc - 1.03 Adrian Stephens 12-May 3.0 0.02 Hang Lui Slide 4 Adrian Stephens, Intel Corporation from slide 2/3 of 11-09/1110r2 (part) by Peter Ecclesine (Cisco Systems) Page 4 Bruce Kraemer, Marvell Peter Ecclesine (Cisco Systems)

5 802.11 Style Guide See 11-09-1034-00-0000-wg11-style-guide.doc
May 2006 doc.: IEEE /0528r0 Nov 2009 Style Guide See wg11-style-guide.doc Adrian Stephens, Intel Corporation from slide 3/3 of 11-09/1110r2 (part) by Peter Ecclesine (Cisco Systems) Bruce Kraemer, Marvell

6 Closing Report Date: 2009-11-20 Authors: Nov 2009 May 2006
doc.: IEEE /0528r0 Nov 2009 Closing Report Date: Authors: Adrian Stephens, Intel Corporation from slide 1/3 of 11-09/1288r0 by Clint Chaplin, Chair (Samsung) Bruce Kraemer, Marvell

7 Closing report for WNG SC for November 2009, Atlanta, Georgia, USA
May 2006 doc.: IEEE /0528r0 Nov 2009 Abstract Closing report for WNG SC for November 2009, Atlanta, Georgia, USA Adrian Stephens, Intel Corporation from slide 2/3 of 11-09/1288r0 by Clint Chaplin, Chair (Samsung) Bruce Kraemer, Marvell

8 Three presentations at this meeting
May 2006 doc.: IEEE /0528r0 November 2009 Three presentations at this meeting Continuous network discovery using Opportunistic Scanning ( ) – Marc Emmelmann Straw Poll: Should IEEE WNG receive further presentations analyzing if existing mechanisms can be used to support seamless handoff for (highly) mobile users? Result: Yes - 21; No - 0; Abstain - 4. Time-based ranging technology for IEEE ( ) – Dong Kyoo Kim IEEE for High Speed Mobility ( ) – Hiroki Nakano Does WNG think that we need further presentations exploring the need for support for mobile communication. Result: Yes - 25; No - 0; Need More Discussion - 3; Don’t Care - 1. Minutes r0 Plans for January 2010 2 hour session Adrian Stephens, Intel Corporation from slide 3/3 of 11-09/1288r0 by Clint Chaplin, Chair (Samsung) Bruce Kraemer, Marvell

9 November 2009 TGmb Closing Report
May 2006 doc.: IEEE /0528r0 Nov 2009 November 2009 TGmb Closing Report Date: Authors: Adrian Stephens, Intel Corporation from slide 1/7 of 11-09/1291r0 by Matthew Gast, Trapeze Networks Bruce Kraemer, Marvell

10 May 2006 doc.: IEEE /0528r0 Nov 2009 Abstract Closing report for TGmb for November 2009 plenary meeting in Atlanta, Georgia, USA. Adrian Stephens, Intel Corporation from slide 2/7 of 11-09/1291r0 by Matthew Gast, Trapeze Networks Bruce Kraemer, Marvell

11 TGmb Status Nov 2009 May 2006 doc.: IEEE 802.11-06/0528r0
Time to (re)circulate… Photo credit: Matthew Gast; used with permission (duh) Adrian Stephens, Intel Corporation from slide 3/7 of 11-09/1291r0 by Matthew Gast, Trapeze Networks Bruce Kraemer, Marvell

12 Accomplishments No interpretation requests received
May 2006 doc.: IEEE /0528r0 Nov 2009 Accomplishments No interpretation requests received Comment processing from LB149 is complete Asking for recirculation ballot 15 days is standard recirculation time, we have requested approximately four weeks due to holiday season and incorporation of w-2009 Roll-up of n-2009 will commence in parallel to letter ballot Recirculation anticipated in March 2010 that includes n-2009 Adrian Stephens, Intel Corporation from slide 4/7 of 11-09/1291r0 by Matthew Gast, Trapeze Networks Bruce Kraemer, Marvell

13 Onward to January No change to end date in plan of record
May 2006 doc.: IEEE /0528r0 Nov 2009 Onward to January No change to end date in plan of record Staying in working group ballot longer Requesting weekly teleconferences every Friday for 90 minutes at 11 am ET beginning January 29 Goal: Recirculation letter ballot after March meeting Adrian Stephens, Intel Corporation from slide 5/7 of 11-09/1291r0 by Matthew Gast, Trapeze Networks Bruce Kraemer, Marvell

14 Revised TGmb Plan of Record (changes from start of week underlined)
May 2006 doc.: IEEE /0528r0 Nov 2009 Revised TGmb Plan of Record (changes from start of week underlined) May 2008 – Issue Call for Comment/Input July 2008 – begin process input and old Interpretation requests Acknowledge previous Task Group referrals Sept 2008 – PAR revision process started Nov 2008 – close receipt of new input Nov 2008 – WG/EC approval of PAR Revision Dec 2008 – NesCom/SASB approval PAR Revision May 2009 – First WG Letter ballot (includes All published Amendments as of May 2009) Nov 2009 – Recirc start May 2010 – Form Sponsor Pool (45 days) July 2010 – Sponsor Ballot Start (Include all published amendments as of July 2010) November 2010 – Sponsor Recirc March 2011 – WG/EC Final Approval June 2011 – RevCom/SASB Approval Adrian Stephens, Intel Corporation from slide 6/7 of 11-09/1291r0 by Matthew Gast, Trapeze Networks Bruce Kraemer, Marvell

15 References Agenda: 11-09/1134r10 Minutes: 11-09/1190r0 Nov 2009
May 2006 doc.: IEEE /0528r0 Nov 2009 References Agenda: 11-09/1134r10 Minutes: 11-09/1190r0 Adrian Stephens, Intel Corporation from slide 7/7 of 11-09/1291r0 by Matthew Gast, Trapeze Networks Bruce Kraemer, Marvell

16 TGp Closing Report Date: 2009-09-24 Author: Nov 2009 May 2006
Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /0528r0 Nov 2009 TGp Closing Report Date: Author: Adrian Stephens, Intel Corporation from slide 1/4 of 11-09/1289r0 by Lee Armstrong (Armstrong Consulting, Inc.) Page 16 Bruce Kraemer, Marvell John Doe, Some Company

17 Abstract TGp closing report for November meetings Nov 2009 May 2006
Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /0528r0 Nov 2009 Abstract TGp closing report for November meetings Adrian Stephens, Intel Corporation from slide 2/4 of 11-09/1289r0 by Lee Armstrong (Armstrong Consulting, Inc.) Page 17 Bruce Kraemer, Marvell John Doe, Some Company

18 November Meetings Summary
LB158 completed since September meeting, passed, no new comments Sponsor Ballot #0 started, will close on 22 November Current comment resolution document, p, represents the 49 comments received as of Wednesday afternoon 4 time slots during the week Majority of meeting time in discussions of key comments, not in voting on resolutions Adrian Stephens, Intel Corporation from slide 3/4 of 11-09/1289r0 by Lee Armstrong (Armstrong Consulting, Inc.)

19 Status D9.0 is the current draft
Nov 2009 Status D9.0 is the current draft Waiting on ballot closing this weekend TGp designated as P802.11p Comment Resolution Committee (CRC) Weekly teleconferences planned for every 1500 Piscataway time will be CRC meetings Plan is to complete comment resolution prior to January meetings Adrian Stephens, Intel Corporation from slide 4/4 of 11-09/1289r0 by Lee Armstrong (Armstrong Consulting, Inc.)

20 TGs Atlanta Closing Report
May 2006 September 2009 doc.: IEEE /0528r0 doc.: IEEE /1091r0 Nov 2009 TGs Atlanta Closing Report Date: Author: Name Address Affiliation Phone Dee Denteneer HTC 37; 5656 AE Eindhoven; The Netherlands Philips Adrian Stephens, Intel Corporation from slide 1/6 of 11-09/1243r1 by Dee Denteneer Page 20 Bruce Kraemer, Marvell Guido R. Hiertz (Philips)

21 Abstract TGs closing report for the November 2009 meeting.
May 2006 September 2009 doc.: IEEE /1091r0 doc.: IEEE /0528r0 Nov 2009 Abstract TGs closing report for the November 2009 meeting. Resolved outstanding comments and ready to go to recirculation. Adrian Stephens, Intel Corporation from slide 2/6 of 11-09/1243r1 by Dee Denteneer Page 21 Bruce Kraemer, Marvell Guido R. Hiertz (Philips)

22 Status TGs passed LB 147 with 79% approval rate (May 2009)
Nov 2009 Status TGs passed LB 147 with 79% approval rate (May 2009) Before the meeting: Comment resolution spreadsheet 11-09/471r18 with 118 comments open Most recent TGs Draft is D3.04 After meeting Most recent TGs comment resolution spread sheet is 11-09/471r23, with resolutions to all comments An annotated agenda for TGs at this meeting in 11-09/1099r9 The TGs draft minutes will be uploaded as 11-09/1223r0 Adrian Stephens, Intel Corporation from slide 3/6 of 11-09/1243r1 by Dee Denteneer

23 Next Steps Produce Draft 4.0 and go to recirculation
Nov 2009 Next Steps Produce Draft 4.0 and go to recirculation TGs is holding teleconferences on Wednesdays through the January Plenary at 4pm (ET)for up to 1½ hours on the Following Dates December 2, January 6, January 13 Goal for the November 2009 TGs meeting in Los Angeles, USA: Start resolving comments received in recirculation Adrian Stephens, Intel Corporation from slide 4/6 of 11-09/1243r1 by Dee Denteneer

24 Moved by Theodorus Denteneer on behalf of TGs TGs vote:
Nov 2009 Motion: Having approved comment resolutions for all of the comments received from LB#147 on P802.11s Draft 3.0 as contained in document 11-09/471r23, Instruct the editor to prepare Draft 4.0 incorporating these resolutions and, Approve a Working Group Recirculation Ballot of at least 15 days asking the question “Should P802.11s Draft 4.0 be forwarded to Sponsor Ballot?” Moved by Theodorus Denteneer on behalf of TGs TGs vote: Moved: Guido Hiertz Seconded: Dan Harkins Result: y: 9-n: 0-a: 0 Adrian Stephens, Intel Corporation from slide 5/6 of 11-09/1243r1 by Dee Denteneer

25 Approved by unanimous consent
Nov 2009 Moved to schedule TGs teleconferences on December 2 , January 6, and January 13 at 4pm for a maximum of 90 minutes to resolve comments and discuss agendas. Approved by unanimous consent Adrian Stephens, Intel Corporation from slide 6/6 of 11-09/1243r1 by Dee Denteneer

26 Closing Report Date: 2009-11-20 Authors: Nov 2009 May 2006
doc.: IEEE /0528r0 Nov 2009 Closing Report Date: Authors: Adrian Stephens, Intel Corporation from slide 1/4 of 11-09/1279r2 by Stephen McCann, RIM Bruce Kraemer, Marvell

27 May 2006 doc.: IEEE /0528r0 Nov 2009 Abstract Closing report for TGu Interworking with External Networks for November 2009, Atlanta, Georgia, USA Adrian Stephens, Intel Corporation from slide 2/4 of 11-09/1279r2 by Stephen McCann, RIM Bruce Kraemer, Marvell

28 Initial Sponsor Ballot (#0) progress
May 2006 doc.: IEEE /0528r0 November 2009 Initial Sponsor Ballot (#0) progress Initial meeting of TGu CRC Resolved 83 technical comments this week, with 73 remaining 6 submissions presented and approved to resolve comments r5 Next sponsor re-circulation ballot in early January 2010 Teleconferences Wednesdays at 11 ET (from 2nd December 2009) Plans for January 2010 Review CRC sponsor ballot activities Continue to resolve sponsor ballot comments Adrian Stephens, Intel Corporation from slide 3/4 of 11-09/1279r2 by Stephen McCann, RIM Bruce Kraemer, Marvell

29 Expert Review List of 10 experts compiled (11-09-1271r0)
May 2006 doc.: IEEE /0528r0 November 2009 Expert Review List of 10 experts compiled ( r0) Send out invitation s to participate For positive responses, then send copies of IEEE u D8.0 for review and comments to further the draft (with time duration) TGu chair will then place response comments into future re-circulation sponsor ballot. Adrian Stephens, Intel Corporation from slide 4/4 of 11-09/1279r2 by Stephen McCann, RIM Bruce Kraemer, Marvell

30 November 2009 Closing Report
May 2006 doc.: IEEE /0528r0 Nov 2009 November 2009 Closing Report Date: Authors: Adrian Stephens, Intel Corporation from slide 1/7 of 11-09/1290r0 by Dorothy Stanley (Aruba Networks) Bruce Kraemer, Marvell

31 May 2006 doc.: IEEE /0528r0 Nov 2009 Abstract This document contains the TGv closing report for November 2009. Adrian Stephens, Intel Corporation from slide 2/7 of 11-09/1290r0 by Dorothy Stanley (Aruba Networks) Bruce Kraemer, Marvell

32 Goals and Accomplishments
May 2006 doc.: IEEE /0528r0 Nov 2009 Goals and Accomplishments Comment resolution from Initial Sponsor Ballot 327 comments, 208 resolutions completed, 119 remain Teleconferences Dec 1, 8, 15, Jan 12, noon-2pm Eastern Adrian Stephens, Intel Corporation from slide 3/7 of 11-09/1290r0 by Dorothy Stanley (Aruba Networks) Bruce Kraemer, Marvell

33 May 2006 doc.: IEEE /0528r0 Nov 2009 Output Documents v-TGv-November-2009-closing-report.ppt v-November-2009-agenda.ppt v-November-2009-meeting notes Adrian Stephens, Intel Corporation from slide 4/7 of 11-09/1290r0 by Dorothy Stanley (Aruba Networks) Bruce Kraemer, Marvell

34 TGv Timeline – Updated Sept, 2009
May 2006 doc.: IEEE /0528r0 Nov 2009 TGv Timeline – Updated Sept, 2009 Initial Working Group Letter Ballot: July 07 – completed Jan 08 – D2.0, May 08 – D3.0, Nov 08 – D4.0 Re-circulation Working Group Letter Ballot: November 08 (D4.0) Mar 09 – D5.0, May 09 – D 6.0, July 09 – D7.0, D7.0(unchanged) Form Sponsor Ballot Pool: August 09 (was June 09) Initial Sponsor Ballot: Oct 09 Oct 09 – D7.0 (was Sept 09) Approved Sponsor Ballot: Nov 09 Jan 09 – D8.0, Feb D9.0, March D10.0, April D11.0 May 12th ( or so) for Revcom June Approval Final WG/EC Approval: July 2010 RevCom/Standards Board Approval: June 4th/June 5th(or so) Note: TGv PAR is authorized through Dec 2010 Adrian Stephens, Intel Corporation from slide 5/7 of 11-09/1290r0 by Dorothy Stanley (Aruba Networks) Bruce Kraemer, Marvell

35 May 2006 doc.: IEEE /0528r0 Nov 2009 Goals for Nov 09 - Jan 2010 Complete initial Sponsor Ballot comment resolution Recirculation Sponsor Ballot Adrian Stephens, Intel Corporation from slide 6/7 of 11-09/1290r0 by Dorothy Stanley (Aruba Networks) Bruce Kraemer, Marvell

36 References Nov 2009 May 2006 doc.: IEEE 802.11-06/0528r0
Adrian Stephens, Intel Corporation from slide 7/7 of 11-09/1290r0 by Dorothy Stanley (Aruba Networks) Bruce Kraemer, Marvell

37 TGz Atlanta Closing Report
May 2006 doc.: IEEE /0528r0 Nov 2009 TGz Atlanta Closing Report Date: 20 November 2009 Authors: Adrian Stephens, Intel Corporation from slide 1/2 of 11-09/1292r0 by Menzo Wentink (Qualcomm) Bruce Kraemer, Marvell

38 TGz Accomplishments in November
May 2006 Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /0528r0 Nov 2009 TGz Accomplishments in November TGz made significant progress in reaching consensus on comments received on the initial sponsor ballot The comments are in 11-09/1185r0 Text submissions are in 11-09/1218r4 (TDLS discovery), 11-09/1281r0 (TDLS path switch) and 11-09/1230r3 (Off-channel selection) We expect to start a first recirculation sponsor ballot after the Los Angeles meeting in January Adrian Stephens, Intel Corporation from slide 2/2 of 11-09/1292r0 by Menzo Wentink (Qualcomm) Page 38 Bruce Kraemer, Marvell John Doe, Some Company

39 May 2006 September 2008 doc.: IEEE /1003r0 doc.: IEEE /0528r0 Nov 2009 802.11aa – Robust Audio Video Transport Streaming Atlanta Closing Report Date: Authors: Adrian Stephens, Intel Corporation from slide 1/8 of 11-09/1269r0 by Ganesh Venkatesan, Intel Corporation Page 39 Bruce Kraemer, Marvell Alex Ashley, NDS Ltd

40 May 2006 November 2007 September 2008 doc.: IEEE /2752r1 doc.: IEEE /1003r0 doc.: IEEE /0528r0 Nov 2009 Abstract TGaa Closing Report for the IEEE Atlanta, Georgia Session (November 2009) Slide 40 Adrian Stephens, Intel Corporation from slide 2/8 of 11-09/1269r0 by Ganesh Venkatesan, Intel Corporation Page 40 Page 40 Bruce Kraemer, Marvell Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

41 Nov 2009 Goals for the session Continue listening to technical proposals and adopting corresponding text into the TGaa draft Joint meeting with ac on approaches to OBSS Joint meeting with 802.1AVB Resolve comments from Internal review of Draft D0.01/D0.02 Adrian Stephens, Intel Corporation from slide 3/8 of 11-09/1269r0 by Ganesh Venkatesan, Intel Corporation

42 Technical Presentations
Nov 2009 Technical Presentations Document number Title Author(s) 1150/r1 Feedback-jamming Multicast ARQ results with capture effect Jochen Miroll 1139/r3 OBSS Management Text Graham Smith 1138/r2 Outline of Proposed OBSS Solution 1137/r1 EDCA Bandwidth Factor 1136/r1 AP Shut Out Neighborhood Effect 0926/r5 Interworking with 802.1Qat Ganesh Venkatesan 1215/r0 Non-contentious (internal review) comments assigned to BrianH Brian Hart 1251/r0 Intra-AC Prioritization Use Cases Alex Ashley 1157/r1 Explain OBSS issue as well as possible simulation scenarios for OBSS in TGac Takatori Yasushi Slide 42 Adrian Stephens, Intel Corporation from slide 4/8 of 11-09/1269r0 by Ganesh Venkatesan, Intel Corporation

43 Accomplishments Listened to 9 technical presentations
Nov 2009 Accomplishments Listened to 9 technical presentations Adopted resolutions to some internal review comments into TGaa draft (1215r0) Listened to the complete OBSS solution and adopted the corresponding (updated) text (1139r3) Brainstormed on intra-AC prioritization Use Cases Met jointly with 802.1AVB Approved 09/926r5 as the guiding document describing the work that needs to be done in aa and 802.1Qat Adrian Stephens, Intel Corporation from slide 5/8 of 11-09/1269r0 by Ganesh Venkatesan, Intel Corporation

44 May 2006 November 2007 September 2008 doc.: IEEE /2752r1 doc.: IEEE /1003r0 doc.: IEEE /0528r0 Nov 2009 Joint meeting with 802.1AVB Presented a solution to support 802.1Qat in (09/926r5) Presented a draft version of changes to in order to support 802.1Qat in Status Update on aa Status Update on 802.1AVB 802.1AS may have up to 2 recirculations before starting sponsor ballot 802.1Qat has planned a recirculation before starting sponsor ballot 802.1Qav is ratified Goals for the March 2010 joint meeting Complete changes to in order to support 802.1Qat and have the changes included in a 11aa draft Slide 44 Adrian Stephens, Intel Corporation from slide 6/8 of 11-09/1269r0 by Ganesh Venkatesan, Intel Corporation Page 44 Page 44 Bruce Kraemer, Marvell Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

45 Goals for the January Interim
Nov 2009 Goals for the January Interim Enter January 2010 session with TGaa Draft 0.03 Adopt text corresponding to all remaining PAR topics into TGaa Draft in the January meeting Work towards completing Draft 1.0 by March 2010 Adrian Stephens, Intel Corporation from slide 7/8 of 11-09/1269r0 by Ganesh Venkatesan, Intel Corporation

46 Mondays 11:00-12:30 Hrs ET on the following days:
Nov 2009 Teleconferences Mondays 11:00-12:30 Hrs ET on the following days: Nov 30, 2009 Dec 14, 2009 Jan 11, 2010 Adrian Stephens, Intel Corporation from slide 8/8 of 11-09/1269r0 by Ganesh Venkatesan, Intel Corporation

47 TGac November 2009 Closing Report
May 2006 Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /0528r0 Nov 2009 TGac November 2009 Closing Report Date: Authors: Adrian Stephens, Intel Corporation from slide 1/5 of 11-09/1277r1 by Osama Aboul-Magd (Samsung) Page 47 Bruce Kraemer, Marvell Osama Aboul-Magd (Samsung)

48 May 2006 Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /0528r0 Nov 2009 Abstract This document is the closing report for the TGac for the November 2009 session. Adrian Stephens, Intel Corporation from slide 2/5 of 11-09/1277r1 by Osama Aboul-Magd (Samsung) Page 48 Bruce Kraemer, Marvell Osama Aboul-Magd (Samsung)

49 Work Completed Selection of ad hoc group chairs is completed
May 2006 Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /0528r0 Nov 2009 Work Completed Selection of ad hoc group chairs is completed PHY (Vinko Erceg, Minho Cheong, Raja Banerjea) MAC (Matthew Fischer, Allan Zhu, Jae Seung Lee) MU-MIMO (Brian Hart, Robert Stacey, Sameer Vermani) Coexistence (Youhan Kim, Eldad Perahia, Yasushi Takatori) Ad Hoc groups conducted their first meetings with focus on procedure discussion. Ad Hoc group reports are included in: PHY  09/1261r0 MAC  09/1260r1 MU-MIMO  09/1262r0 Coexistence  09/1265r2 The TG accepted a new revision of the Functional Requirements and Evaluation Methodology document (09/0451r8). The TG agreed on an initial guideline for Ad Hoc scope (09/1175r1). Technical Presentations. Adrian Stephens, Intel Corporation from slide 3/5 of 11-09/1277r1 by Osama Aboul-Magd (Samsung) Page 49 Bruce Kraemer, Marvell Osama Aboul-Magd (Samsung)

50 May 2006 Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /0528r0 Nov 2009 January 2010 Goals Plan to continue with Ad Hoc group meetings with focus to further define the scope and work items for each ad hoc. Submissions Adrian Stephens, Intel Corporation from slide 4/5 of 11-09/1277r1 by Osama Aboul-Magd (Samsung) Page 50 Bruce Kraemer, Marvell Osama Aboul-Magd (Samsung)

51 Conference Call Times December 3, 2009 December 17, 2009
May 2006 Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /0528r0 Nov 2009 Conference Call Times December 3, 2009 PHY Ad Hoc  21:00 -22:00 ET December 17, 2009 MAC Ad Hoc  20:00 – 21:00 ET MIMO-MU Ad Hoc  11:00 –12:00 ET January 7, 2010 Coexistence Ad Hoc  20:00 – 22:00 ET January 14, 2010 PHY Ad Hoc  11:00 -12:00 ET Adrian Stephens, Intel Corporation from slide 5/5 of 11-09/1277r1 by Osama Aboul-Magd (Samsung) Page 51 Bruce Kraemer, Marvell Osama Aboul-Magd (Samsung)

52 TGad November 2009 Closing Report
May 2006 doc.: IEEE /0528r0 Nov 2009 TGad November 2009 Closing Report Date: Authors: Adrian Stephens, Intel Corporation from slide 1/7 of 11-09/1117r0 by Eldad Perahia, Intel Corporation Bruce Kraemer, Marvell

53 May 2006 doc.: IEEE /0528r0 Nov 2009 Abstract This document is the closing report for the TGad for the November 2009 session. Adrian Stephens, Intel Corporation from slide 2/7 of 11-09/1117r0 by Eldad Perahia, Intel Corporation Bruce Kraemer, Marvell

54 Work Completed (1/2) Evaluation Methodology
Nov 2009 Work Completed (1/2) Evaluation Methodology 09/1160, Proposed Evaluation Methodology Additions, John Barr 09/1216, Internet traffic modeling, Sai Nandagopalan 09/1213, 60GHz Impairments Modeling, Vinko Erceg 09/1222r1, Hard disk drive traffic model, Eldad Perahia 09/1229, Application of 60 GHz Channel Models for Comparison of TGad Proposals, Alexander Maltsev 09/296r12, Update to Evaluation Methodology document, Eldad Perahia 09/1210, Coexistence Techniques, Tuncer Baykas Motion to adopt 09/0296r12 as the first draft of the TGad evaluation methodology failed 24/20/7 Adrian Stephens, Intel Corporation from slide 3/7 of 11-09/1117r0 by Eldad Perahia, Intel Corporation

55 Work Completed (2/2) Channel Modeling, Tues PM2, Wed PM2, Th AM2
May 2006 doc.: IEEE /0528r0 Nov 2009 Work Completed (2/2) Channel Modeling, Tues PM2, Wed PM2, Th AM2 09/1252, Inter Cluster Parameters of Living Room Channel Model for 60 GHz WLAN Systems, Alexander Maltsev 09/1152, 60-GHz Living-Room Channel Measurements, Tian-Wei Huang 09/1169, Human Body Blockage - Guidelines for TGad MAC development, Thomas Kürner 09/1170, Modeling the human induced 60 GHz channel dynamics, Thomas Kürner 09/1165, 60 GHz Cubicle Wall Reflectivity, Chris Hansen 09/1232, Intra-cluster response model and parameter for channel modeling at 60GHz (Part2), Hirokazu Sawada Other technical submissions 09/1153, 60GHz Beamforming, Carlos Cordeiro 09/1168, SCR Design and Performance Assessment, John Stine Call for Proposals Motion to adopt 09/1206r0 as the TGad call for proposals passed 50/0/19 Chair to announce in WG and reflector Adrian Stephens, Intel Corporation from slide 4/7 of 11-09/1117r0 by Eldad Perahia, Intel Corporation Bruce Kraemer, Marvell

56 Nov 2009 Call for Proposals Two types of proposals New Techniques Complete Proposals Definition in Notification of intent to present: December 18, 2009 Must both TG chair and WG chair Date applies to proposers of both New Techniques and Complete Proposals For New Techniques presented in March 2010 Date that material must be on mentor: February 28, 2010 For New Techniques presented in May 2010 Date that material must be on mentor: May 2, 2010 For Complete Proposals presented in May 2010 Adrian Stephens, Intel Corporation from slide 5/7 of 11-09/1117r0 by Eldad Perahia, Intel Corporation

57 Goals for January 2010 Continue working on task group documents
May 2006 doc.: IEEE /0528r0 Nov 2009 Goals for January 2010 Continue working on task group documents Technical contributions Adrian Stephens, Intel Corporation from slide 6/7 of 11-09/1117r0 by Eldad Perahia, Intel Corporation Bruce Kraemer, Marvell

58 Conference call times Dec 10 Jan 7 10:00-12:00 ET
May 2006 doc.: IEEE /0528r0 Nov 2009 Conference call times Dec 10 10:00-12:00 ET Evaluation Methodology Jan 7 Channel Model Adrian Stephens, Intel Corporation from slide 7/7 of 11-09/1117r0 by Eldad Perahia, Intel Corporation Bruce Kraemer, Marvell

59 IEEE 802.11 TV White Spaces Study Group Closing Report
May 2006 April 2009 doc.: IEEE /xxxxr0 doc.: IEEE /0528r0 Nov 2009 IEEE TV White Spaces Study Group Closing Report Date: Authors: Adrian Stephens, Intel Corporation from slide 1/6 of 11-09/1286r0 by Rich Kennedy, Research In Motion Page 59 Bruce Kraemer, Marvell Rich Kennedy, Research In Motion

60 May 2006 April 2009 doc.: IEEE /xxxxr0 doc.: IEEE /0528r0 Nov 2009 Abstract This presentation is the closing report for the Atlanta meeting of the IEEE TVWS SG. Adrian Stephens, Intel Corporation from slide 2/6 of 11-09/1286r0 by Rich Kennedy, Research In Motion Page 60 Bruce Kraemer, Marvell Rich Kennedy, Research In Motion

61 Agenda Introduction Administrative items including
Nov 2009 Agenda Introduction Administrative items including Review and respond to the received comments on the TVWS PAR and 5C tvws-par-nescom-form-plus-5c Plan for the IEEE 802 Wireless Interim in Los Angeles [January 18th through 22nd] Request teleconferences Adrian Stephens, Intel Corporation from slide 3/6 of 11-09/1286r0 by Rich Kennedy, Research In Motion

62 Nov 2009 Accomplishments Reviewed all of the received comments on the TVWS PAR and 5C Responses in tvws-replies-to-comments-on tvws-par-5c Edited the PAR and 5C document and uploaded it tvws-par-nescom-form-plus-5c Selected one teleconference slot to request 20:00 ET on January 12th Discussed the plan for now until the January interim Adrian Stephens, Intel Corporation from slide 4/6 of 11-09/1286r0 by Rich Kennedy, Research In Motion

63 Documents 11-09-1240-04-tvws-replies-to-comments-on-802-11-tvws-par-5c
Nov 2009 Documents tvws-replies-to-comments-on tvws-par-5c tvws-par-nescom-form-plus-5c Adrian Stephens, Intel Corporation from slide 5/6 of 11-09/1286r0 by Rich Kennedy, Research In Motion

64 Thanks to all who participated!
Nov 2009 Thanks to all who participated! See you in LA Adrian Stephens, Intel Corporation from slide 6/6 of 11-09/1286r0 by Rich Kennedy, Research In Motion

65 QoSMAN SG Closing Report – Nov 2009
May 2006 Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /0528r0 Nov 2009 QoSMAN SG Closing Report – Nov 2009 Date: Authors: Adrian Stephens, Intel Corporation from slide 1/8 of 11-09/1211r1 by Michael Montemurro, Research In Motion Page 65 Osama Aboul-Magd (Samsung) Bruce Kraemer, Marvell

66 May 2006 Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /0528r0 Nov 2009 Abstract This document is the closing report for the QoSMAN SG for the November 2009 session. Adrian Stephens, Intel Corporation from slide 2/8 of 11-09/1211r1 by Michael Montemurro, Research In Motion Page 66 Osama Aboul-Magd (Samsung) Bruce Kraemer, Marvell

67 May 2006 Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /0528r0 Nov 2009 Work Completed Thanks to Stephen McCann as acting Secretary for the group. Minutes: Discussion on the process moving forward as a Task Group Processed PAR and 5C comments: Completed and accepted the PAR and 5C document A Teleconference has been planned for January 14 at 11:00h ET. Motions to approve PAR comment resolutions and PAR and 5C document. Adrian Stephens, Intel Corporation from slide 3/8 of 11-09/1211r1 by Michael Montemurro, Research In Motion Page 67 Osama Aboul-Magd (Samsung) Bruce Kraemer, Marvell

68 Motion to approve QOSMAN PAR comment resolutions
July 2009 May 2006 doc.: IEEE /0528r0 Nov 2009 Motion to approve QOSMAN PAR comment resolutions Move to accept the QOSMAN PAR comment resolutions in document Moved: Stephen McCann Seconded: Paul Lambert Vote: Yes – 6, No – 0, Abstain – 1. Motion Passes. Adrian Stephens, Intel Corporation from slide 4/8 of 11-09/1211r1 by Michael Montemurro, Research In Motion Page 68 McCann et al. (RIM) Bruce Kraemer, Marvell

69 May 2006 April 2009 doc.: IEEE /xxxxr0 doc.: IEEE /0528r0 Nov 2009 SG Motion Believing that the QoSMAN PAR and Five Criteria contained in the documents referenced below meet IEEE-SA guidelines, Request that the QoSMAN PAR and the Five Criteria contained in document qm-qosman-par-nescom-form-plus-5cs.doc be forwarded to the WG for approval of the full Working Group. Moved: Paul Lambert Seconded: Stephen McCann Vote: Yes – 6, No – 0, Abstain – 0. Adrian Stephens, Intel Corporation from slide 5/8 of 11-09/1211r1 by Michael Montemurro, Research In Motion Page 69 Rich Kennedy, Research In Motion Bruce Kraemer, Marvell

70 May 2006 April 2009 doc.: IEEE /xxxxr0 doc.: IEEE /0528r0 Nov 2009 WG Motion Believing that the QoSMAN PAR and Five Criteria contained in the documents referenced below meet IEEE-SA guidelines, Request that the QoSMAN PAR and the Five Criteria contained in qm-qosman-par-nescom-form-plus-5cs.doc be posted to the IEEE 802 Executive Committee (EC) agenda for WG 802 preview and EC approval to submit to NesCom. Moved by Michael Montemurro on behalf of the IEEE QOSMAN SG QOSMAN SG vote: Moved: Paul Lambert, Seconded: Stephen McCann, Result: 6-0-0 Adrian Stephens, Intel Corporation from slide 6/8 of 11-09/1211r1 by Michael Montemurro, Research In Motion Page 70 Rich Kennedy, Research In Motion Bruce Kraemer, Marvell

71 Task Group Process Strawman
July 2009 May 2006 doc.: IEEE /0528r0 Nov 2009 Task Group Process Strawman Prepare a Requirements Document Consider use cases to justify requirements Use previous submissions as a basis Prioritize the requirements (mandatory/optional) Solicit individual proposals First Draft Adrian Stephens, Intel Corporation from slide 7/8 of 11-09/1211r1 by Michael Montemurro, Research In Motion Page 71 McCann et al. (RIM) Bruce Kraemer, Marvell

72 January 2009 Goals Begin work as a Task Group
May 2006 Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /0528r0 Nov 2009 January 2009 Goals Begin work as a Task Group Elect Task Group Officers: Chair, Editor, and Secretary Establish a timeline. Create a requirements and use cases document for management frame prioritization. Adrian Stephens, Intel Corporation from slide 8/8 of 11-09/1211r1 by Michael Montemurro, Research In Motion Page 72 Osama Aboul-Magd (Samsung) Bruce Kraemer, Marvell

73 Closing Report Date: 2009-11-20 Authors: Nov 2009 May 2006
doc.: IEEE /0528r0 Nov 2009 Closing Report Date: Authors: Adrian Stephens, Intel Corporation from slide 1/7 of 11-09/1284r0 by Andrew Myles, Cisco Bruce Kraemer, Marvell

74 May 2006 doc.: IEEE /0528r0 Nov 2009 Abstract Closing report for JTC1 ad hoc for November 2009, Atlanta, Georgia, USA Adrian Stephens, Intel Corporation from slide 2/7 of 11-09/1284r0 by Andrew Myles, Cisco Bruce Kraemer, Marvell

75 JTC1 ad hoc discussed the WAPI NP proposal & wrote two liaisons to SC6
May 2006 doc.: IEEE /0528r0 Nov 2009 JTC1 ad hoc discussed the WAPI NP proposal & wrote two liaisons to SC6 Progress in Atlanta Discussed China NB’s proposal for a WAPI NP in ISO/IEC Wrote letter ( r1) to SC6 responding to claims that isn insecure in the WAPI NP proposal Wrote letter to SC6: Reporting recent and planned future activities in the IEEE Working Group Flagging an intention to submit certain documents to ISO/IEC using the PDSO process Offering JTC1 and SC6 National Bodies the opportunity to submit comments into the Sponsor Ballot process Plans for Jan 2010 Consider any JTC1 liaison issues Start technical evaluation of WAPI Adrian Stephens, Intel Corporation from slide 3/7 of 11-09/1284r0 by Andrew Myles, Cisco Bruce Kraemer, Marvell

76 Nov 2009 JTC1 ad hoc approved a liaison to SC6 relating to ISO/IEC JTC 1/SC6 N 14123 Motion The IEEE JTC1 ad hoc recommends to the IEEE WG and IEEE 802 ExCom that the letter contained in r1 be liaised to ISO/IEC JTC1/SC6. This letter provides a response to some of the material liaised to the IEEE staff in ISO/IEC JTC 1/SC6 N The letter should be sent to the SC6 Secretariat. It should also be CC’ed to the individuals and organisations addressed by the that notified IEEE staff about ISO/IEC JTC 1/SC6 N IEEE staff should be authorised to make any necessary editorial changes Moved: David Hunter Seconded: Jerry Thrasher Result 11/0/0 Adrian Stephens, Intel Corporation from slide 4/7 of 11-09/1284r0 by Andrew Myles, Cisco

77 Nov 2009 WG will consider a liaison to SC6 relating to ISO/IEC JTC 1/SC6 N 14123 Motion The IEEE JTC1 ad hoc and IEEE WG recommends to the IEEE 802 ExCom that the letter contained in r1 be liaised to ISO/IEC JTC1/SC6. This letter provides a response to some of the material liaised to the IEEE staff in ISO/IEC JTC 1/SC6 N The letter should be sent to the SC6 Secretariat. It should also be CC’ed to the individuals and organisations addressed by the that notified IEEE staff about ISO/IEC JTC 1/SC6 N IEEE staff should be authorised to make any necessary editorial changes Moved: Seconded: Result: Adrian Stephens, Intel Corporation from slide 5/7 of 11-09/1284r0 by Andrew Myles, Cisco

78 Nov 2009 JTC1 ad hoc approved a liaison to SC6 relating to plans to use the PSDO Motion The IEEE JTC1 ad hoc recommends to the IEEE WG and IEEE 802 ExCom that the letter contained in r1 be liaised to ISO/IEC JTC1/SC6. This letter documents recent and planned future activities in the IEEE Working Group, flags an intention to submit certain documents to ISO/IEC using the PDSO process, and offers JTC1 and SC6 National Bodies the opportunity to submit comments into the Sponsor Ballot process. The letter should be sent to the SC6 Secretariat. The IEEE Working Group Chair should be authorised to make any necessary editorial changes. Moved: Dan Harkins Seconded: Jim Raab Result 12/0/0 Adrian Stephens, Intel Corporation from slide 6/7 of 11-09/1284r0 by Andrew Myles, Cisco

79 Nov 2009 WG will consider a liaison to SC6 relating to plans to use the PSDO Motion The IEEE JTC1 ad hoc and IEEE WG recommends to IEEE 802 ExCom that the letter contained in r1 be liaised to ISO/IEC JTC1/SC6. This letter documents recent and planned future activities in the IEEE Working Group, flags an intention to submit certain documents to ISO/IEC using the PDSO process, and offers JTC1 and SC6 National Bodies the opportunity to submit comments into the Sponsor Ballot process. The letter should be sent to the SC6 Secretariat. The IEEE Working Group Chair should be authorised to make any necessary editorial changes. Moved: Seconded: Result: Adrian Stephens, Intel Corporation from slide 7/7 of 11-09/1284r0 by Andrew Myles, Cisco

80 IEEE 802.11 Regulatory Ad Hoc Committee Closing Report
May 2006 April 2009 doc.: IEEE /xxxxr0 doc.: IEEE /0528r0 Nov 2009 IEEE Regulatory Ad Hoc Committee Closing Report Date: Authors: Adrian Stephens, Intel Corporation from slide 1/6 of 11-09/1287r0 by Rich Kennedy, Research In Motion Page 80 Bruce Kraemer, Marvell Rich Kennedy, Research In Motion

81 May 2006 April 2009 doc.: IEEE /xxxxr0 doc.: IEEE /0528r0 Nov 2009 Abstract This presentation is the closing report for the Atlanta meeting of the IEEE Regulatory Ad Hoc Committee. Adrian Stephens, Intel Corporation from slide 2/6 of 11-09/1287r0 by Rich Kennedy, Research In Motion Page 81 Bruce Kraemer, Marvell Rich Kennedy, Research In Motion

82 Agenda Introduction The regulatory summaries FOCUS: North America
Nov 2009 Agenda Introduction The regulatory summaries North America European Union Asia FOCUS: Input to ERM TG11 on EN v1.8.1 FCC changes in the 5GHz band Adrian Stephens, Intel Corporation from slide 3/6 of 11-09/1287r0 by Rich Kennedy, Research In Motion

83 Accomplishments Provided updates on relevant regulatory actions
Nov 2009 Accomplishments Provided updates on relevant regulatory actions Discussed the status of the revision of ERM TG11 Called for more participation to prevent unwanted regulations Discussed the impact of new 5 GHz certification rules FCC KDB “devices will not permit operations on channels which overlap the MHz band” Operation in 5250 – 5350 MHz and 5470 – 5725 MHz bands is restricted to indoor With these stipulations, certification can begin again Discussed the just released (17 November) Ofcom consultation on “Geolocation for Cognitive Access” Responses due 9 February 2010 Will plan response on conference calls Adrian Stephens, Intel Corporation from slide 4/6 of 11-09/1287r0 by Rich Kennedy, Research In Motion

84 Documents 11-09-1141-01-0reg-atlanta-meeting-plan-and-agenda-nov-2009
Adrian Stephens, Intel Corporation from slide 5/6 of 11-09/1287r0 by Rich Kennedy, Research In Motion

85 Thanks to all who participated!
Nov 2009 Thanks to all who participated! See you in Atlanta Adrian Stephens, Intel Corporation from slide 6/6 of 11-09/1287r0 by Rich Kennedy, Research In Motion


Download ppt "Nov 2009 Closing Plenary Reports"

Similar presentations


Ads by Google