Download presentation
Presentation is loading. Please wait.
1
Update on beam screen issues
WP3 Meeting, 5 Nov 2013 WP3 – Magnets for Insertion Regions Update on beam screen issues Roberto Kersevan TE-VSC-IVM
2
- Preliminary design of the beam screen (BS) for the Q1 and Q2-Q3- D1 areas - Preliminary design of the Tungsten* shielding (* Inermet 180, Plansee) 12/6/2018 WP3 – Magnets for Insertion Regions
3
HL-LHC TRIPLET LATTICE BPMs
White bands: allowed BPM installation areas E. Todesco 12/6/2018 Proposed BPM locations R. Jones HL-LHC PLC Jan 2013 Current BPM locations WP3 – Magnets for Insertion Regions
4
What if increased shielding at Q1?
12/6/2018 L. Esposito Reduction of the beam screen diameter at Q1 proposed by S. Fartoukh with corresponding increase of the W shielding to reduce radiation dose. WP3 – Magnets for Insertion Regions
5
Interconnects: margins on no W shielding length of BS
12/6/2018 = 438 mm seems the bare minimum Taper: 15 degrees slant? WP3 – Magnets for Insertion Regions
6
Heat Loads: collision debris
12/6/2018 WP3 – Magnets for Insertion Regions
7
Heat Loads: Image currents at resistive wall
See presentation by N. Mounet, EPFL-CERN @CERN-LARP Meeting, Daresbury “Transverse impedance and stability limits in the HL-LHC era (including flat bunches from 800 MHz) for the proposed collimator settings”, WP2 Joint session 12/6/2018 WP3 – Magnets for Insertion Regions
8
Heat Loads: e-cloud 12/6/2018 WP3 – Magnets for Insertion Regions
9
Luca Dassa, Rafael Fernandez Gomez, EN-MME-ES
Preliminary design of the beam screen (BS) for the Q1 and Q2-Q3-D1 areas. 12/6/2018 Luca Dassa, Rafael Fernandez Gomez, EN-MME-ES WP3 – Magnets for Insertion Regions
10
Luca Dassa, Rafael Fernandez Gomez, EN-MME-ES
Preliminary design of the beam screen (BS) for the Q1 and Q2-Q3 areas (D1 on the “to do”list). 12/6/2018 Luca Dassa, Rafael Fernandez Gomez, EN-MME-ES WP3 – Magnets for Insertion Regions
11
Luca Dassa, Rafael Fernandez Gomez, EN-MME-ES
Preliminary design of the beam screen (BS) for the Q1 and Q2-Q3 areas (D1 on the “to do”list). 12/6/2018 16mm 6mm Q3, D1(?) Luca Dassa, Rafael Fernandez Gomez, EN-MME-ES WP3 – Magnets for Insertion Regions
12
Short and medium term plan: (not necessarily a sequential list of actions)
- Visit/discussion with Plansee (25 Nov 2013) - Define brazing parameters of W shielding on BS - Prototype brazing and validate (LN2 thermal chock) - Launch 1m-long prototype of cold-bore (CB) with 304L SS BS, to study achievable tolerances - Procure P506 SS - Launch 8m-long prototype with CB, real P506 BS - Carry out precise estimate of cryogenic exergy losses, and related modifications (if necessary) to cryo-circuit and loops - Cold-test 8m-long prototype?... - All this compatibly with… (P. Fessia, RLIUP workshop, Nov 2013)… 12/6/2018 WP3 – Magnets for Insertion Regions
13
With many thanks to: P. Fessia, M
With many thanks to: P. Fessia, M.Buzio: data on W shielding materials, measurement of effect on quadrupole harmonics; L. Dassa, R.F. Gomez: design of BS; R. van Weelderen: cryogenic issues; N. Koos, C. Garion, V. Baglin: various engineering and vacuum issues, such as specifications, structural stresses during quench, vacuum vs BS temperature; Thanks for your attention: any questions? 12/6/2018 WP2 - Task Leaders' Meeting
Similar presentations
© 2025 SlidePlayer.com. Inc.