Download presentation
Presentation is loading. Please wait.
Published byΠανκρατιος Αθανασίου Modified over 6 years ago
1
CSC Simulation Status Trigger very sensitive to wire timing!
Re-tuning to center wire digis causes big problems. Wire digis: a few percent bunch crossing error. Anode LCTs: 3% have early bunch crossing. Global muon trigger: rejects 10% because of early bunch crossing. Not clear who needs to change things. Gas gain was too low in ME1/A Caused RecHit efficiency to drop to 96% Fixed in CMSSW_1_6_0_pre7 Plans for 1_7_0 Use new interface to conditions. Allows optimization of DB access. Rick Wilkinson
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.