1 HMA Follow On Activities
Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly Progress Meeting 3 November 2009 Reuben Wright, Deimos Space Johannes Echterhoff, iGSI Philippe Merigot, Spot Image

2 Schedule Deliverables Work in Progress SPS 2.0 (OGC09-000)
sweCommon (OGC ) SPS for EO Application profile (OGC ) SFRE Requirements Baseline Document

3 Schedule 1/2

4 Schedule 2/2

5 Proposal Information: List of Documentation Deliverables

6 Proposal Information: List of Software Deliverables

7 Work in Progress: SPS 2.0 (OGC09-000)
Status of specification Key dates: Nov 19th 2009: three-week rule for OGC meeting in December SPS / SWES specifications ready only minor changes before OGC meeting Dec 7th – 11th 2009: OGC meeting in USA presentation of specification in SPS SWG SWG vote for release into RFC (request for comment phase) After TC: 30 day comment period review of comments at TC in March 2010 final version of SPS 2.0 at least three weeks prior to TC meeting June, 2010 TC in June 2010: SWG vote to release for adoption TC/PC vote to release for adoption 60 day IPR review and eVote

8 Work in Progress: SPS 2.0 (OGC09-000)
Outstanding issues finalization of SWE Common Service Model (OGC ) – foreseen for Nov 19th 2009 migration to OWS Common 1.2 OWS Common 1.2 is currently in eVote for adoption (ends Nov. 20th, 2009) we have some comments on the spec decision tbd. during RFC phase writing of specification according to “The Specification Model” (OGC r3) Abstract Test Suite ready for review on Nov 19th 2009 possibility to revise / enhance the test suite according to comments from HMA and others

9 Work in Progress: sweCommon (OGC 08-094)
Status of specification Finalization foreseen for Nov 19th – out for comments and edits Reorganized to match requirements of the new OGC specification model (OGC r3). UML models, XML schemas and the latest specification available for comments on the attachment section of the specification page: SWG discussion on list and teleconferences managed by Alexandre Robin Outstanding issues Technical points from Nov 2 teleconference agenda are: Do we need to keep choiceValue in DataChoice? Do we need to make “definition” mandatory? How do we model conditional value? Can we define “ObservableProperty” in SensorML?

10 Work in Progress: SPS for EO Application profile (OGC 07-018)
Status of specification Finalization foreseen for Nov 19th Development alongside SPS 2.0 High-level ESA requirements believed to be collected Outstanding issues Produce a summary of the understanding of requirements for 13 November so that it can be checked.

11 Work in Progress: SFRE Requirements Baseline Document
Status of document First draft on 19/10/09 Undergoing review Document needs to be issued before PR, but expected to be finalised before then Outstanding issues The description of the high level requirements of SFRE linked to the objectives of the SPS EO specification work Granularity of requirements (noting that a full SRD will be created later) What activities the Client is to allow the user to perform, and how it displays results to them. Not directly related to HMA specification testing, but desire to demonstrate their use.


Download ppt "HMA Follow On Activities"