Download presentation
Presentation is loading. Please wait.
Published byLee Fields Modified over 6 years ago
1
WESLEYAN P-32-2 MAINTAIN JUT OUT AND PAINT TO MATCH SIDING
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). MAJOR MAINTENANCE FY 16 167 / 169 HIGH STREET VINYL SIDING, 2ND FLOOR WINDOW REPLACEMENT SECTION EXISTING CONDITION PHOTOS DATE: 12/20/14 PHOTO. NO. WESLEYAN U N I V E R S I T Y REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 P-32-2
2
Provide additional flashing behind siding and over crown of all windows on 2nd floor to provide proper water diversion. MAJOR MAINTENANCE FY 16 167 / 169 HIGH STREET VINYL SIDING, 2ND FLOOR WINDOW REPLACEMENT SECTION EXISTING CONDITION PHOTOS DATE: 12/20/14 PHOTO. NO. WESLEYAN U N I V E R S I T Y REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 P-32-3
3
Scrape and paint arched siding
MAJOR MAINTENANCE FY 16 167 / 169 HIGH STREET VINYL SIDING, 2ND FLOOR WINDOW REPLACEMENT SECTION EXISTING CONDITION PHOTOS DATE: 12/20/14 PHOTO. NO. WESLEYAN U N I V E R S I T Y REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 P-32-4
4
New Bilco hatchway door and framing
MAJOR MAINTENANCE FY 16 167 / 169 HIGH STREET VINYL SIDING, 2ND FLOOR WINDOW REPLACEMENT SECTION EXISTING CONDITION PHOTOS DATE: 12/20/14 PHOTO. NO. WESLEYAN U N I V E R S I T Y REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 P-32-5
5
WESLEYAN P-32-6 CARPENTRY REPAIR MAJOR MAINTENANCE FY 16
167 / 169 HIGH STREET VINYL SIDING, 2ND FLOOR WINDOW REPLACEMENT SECTION EXISTING CONDITION PHOTOS DATE: 12/20/14 PHOTO. NO. WESLEYAN U N I V E R S I T Y REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 P-32-6
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.