Mewong Scenario Exercise DO NOT PRINT IN WORKBOOK WFP Logistics, We Deliver
2
Lesson Plan: Mewong Scenario ConOps
LEARNING OBJECTIVES: By the end of the session, participants will be able to: Calculate the tonnage to be transported Develop a Concept of Operations Present the findings of the calculations and Concept of Operations Structure Timing Activities Introduction 5 minutes Explain lesson objectives Exercise: Overview Explain the exercise, where participants in groups are part of a logistics team dealing with shelter and food for a 3 month intervention Exercise: ConOps 170 minutes In groups, calculate the tonnage to be transported, prepare a concept of operations and prepare a presentation of the findings Exercise: Debrief 85 minutes Each group will present their tasks, provide rational for why the developed their plan the way they did and answer questions from other groups. The facilitator should explain that no one right answer exists but it is about the process and justification as to how each group developed their plans. Lesson End/Plenary EVALUATION / RECAP QUESTIONS: The facilitator should ask the questions below, or similar questions to the class to recap the lesson to ensure participants have understood the lesson content. N/A Total Lesson Length 270 minutes This slide is for the facilitators reference only. This slide should be hidden from the workbook and from the class presentation DO NOT PRINT IN WORKBOOK DO NOT DISPLAY IN CLASS
3
Mewong: Concept of Operation
Earthquake: 7.2 Richter scale Affected population: Growing number of IDPs Infrastructure severely damaged DO NOT PRINT IN WORKBOOK
4
Mewong: Concept of Operation
Role You are the logistics team for a generic organisation You are dealing with food and shelter ONLY for the initial 3 months Task Calculate tonnage to be transported Prepare a Concept of Operation Present your ConOps to your supervisor DO NOT PRINT IN WORKBOOK Time Total: 4.5 hours Preparation ConOps: 3 hours Presentation: 1.5 hour (following morning) Handouts Mewong beneficiaries need Mewong procurement basic data Exercise presentation
5
Planning assumptions / Security / Operational Constraints
CONOPS Contents Background Scope of emergency Planning assumptions / Security / Operational Constraints DO NOT PRINT IN WORKBOOK Operational Logistics Response Upstream network / Entry points / Coordination mechanisms / Hubs / Means of transport / What and Where Map
6
Possible solution for CONOPS map
Entry corridor Primary transport road Secondary transport road