Download presentation
Presentation is loading. Please wait.
1
Introduction Foundation Re-design Analysis
CM Analysis – Technology in the Trailer Owner Analysis – Financing Options/Strategies Conclusion Introduction NOVA Foundation - Current System, Method, Cost, Schedule -Soil Type -Problems Jeff White, EIT Construction Mgmt. Existing Conditions -Industry wide -NOVA Project based Existing Financing for NOVA Projects -Benefits -Weaknesses Wrap Up -Conclusions -Key Findings Proposed Solutions -SIPS Analysis by changing Construction Process -Design Change to MAT foundation Project Overview Team Players Project Delivery Method Project Costs Schedule Condition Analysis -Problems/Inefficiencies discovered -Strengths discovered Alternative Financing Options #1 -Benefits/Weaknesses Thank You’s Existing Conditions -MEP systems -Structural System -Location -Finishes/Specialty Items SIPS Analysis Results -Cost Impact -Schedule Impact Proposed Adjustments -New Technologies -Contract Adjustments -Alternative Setups -Cost Analysis Alternative Financing Options #2 -Benefits/Weaknesses Questions MAT foundation design -Benefits -Disadvantages -Constructability -Structural Calculations/Feasibility Presentation Outline Design Analysis/Research CM Analysis/Research Owner Analysis/Research Adjustment Impacts -Efficiency's -Risk Analysis Alternative Financing Options #3 -Benefits/Weaknesses Industry Wide – Flow Chart -Financing Options Advantages/Disadvantages per differing projects/owners
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.