Download presentation
Presentation is loading. Please wait.
1
3a) Load or Verify IonSource & Tune File
1) Dilute Sample 2) Click Green Button 4) Change Run time, Start mass, End Mass, Scan time=1000 5) Click PLAY Choose User, Sample Group, Data filename, SSI Pump checked 3b) Connect longer red peek tubing at rheodyne to solvent pump. Click TURN ON to run solvent 7) Wipe flat Syringe Outside/ Clean Inside 6) Check Stable Solvent Flow 8) Put 10-20uL diluted Sample In LOAD Turn to INJECT to see in MS 9) Verify TIC peak Click Data Express Extract & Label 10) STOP Standby Clean Syringe & “Load Port” 3a) Load or Verify IonSource & Tune File
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.