Dan Bryant and Jim Wilson Geo-Cleanse International, Inc.
Case Studies of Fenton’s Reagent ISCO at MGP and Chlorinated Solvent Sites Dan Bryant and Jim Wilson Geo-Cleanse International, Inc. In-Situ Treatment of Groundwater Contaminated with Non-Aqueous Phase Liquids: Fundamentals and Case Studies December 10-12, 2002 1
2
Full Scale Chemical Oxidation of MGP Hydrocarbons In Soil and Groundwater Using Fenton’s Reagent
Jim Lingle Elizabeth Hellman Mike Noel Jim Wilson Geo-Cleanse International, Inc. 2
3
Burlington MGP Conceptual Cross Section
Shallow Injector Intermediate Injector Deep Injector Geomembrane Fill ~5 ft Sand and Gravel ~13-25 ft Bedrock 3
4
4
5
5
6
Laying Geomembrane 6
7
Injector Array 7
8
Chemical Injector Head
8
9
9
10
10
11
BTEXM & PAH Removal from Groundwater
(through 2001 construction season) Sandy soil along road Silty soil mid-site Soil near river Overall site 97% removal 80% removal 93% removal 11
12
New Jersey MGP – Bench Test Analytical Results
12
13
New Jersey MGP – Bench Test TPH Oxidant Demand
13
14
In-Situ Chemical Oxidation at Naval Submarine Base
Kings Bay, Georgia 14
15
NSB Kings Bay, GA 15
16
Kings Bay Site Map Groundwater Flow Phase III Area Scale : 40 ft
Monitor Well Phase I (32’) Phase II (35’) Recovery Well Phase I (42’) Phase II (40’) 16
17
Kings Bay Phase I-III Results
17
18
Kings Bay Phase I-III Results – Expanded Scale
18
19
Kings Bay - Phase III Treatment Results
19
20
Kings Bay Site Map Groundwater Flow Vegetable Oil Polish Scale : 40 ft
Monitor Well Phase I (32’) Phase II (35’) Recovery Well Phase I (42’) Phase II (40’) 20