Presentation is loading. Please wait.

Presentation is loading. Please wait.

July 2002 Project: IEEE P802.11 Working Group for Wireless Local Area Networks (WLANs) Submission Title: 802.15 Liaison Report, July 2002 Date Submitted:

Similar presentations


Presentation on theme: "July 2002 Project: IEEE P802.11 Working Group for Wireless Local Area Networks (WLANs) Submission Title: 802.15 Liaison Report, July 2002 Date Submitted:"— Presentation transcript:

1 July 2002 Project: IEEE P Working Group for Wireless Local Area Networks (WLANs) Submission Title: Liaison Report, July 2002 Date Submitted: 12 July 2002 Source: Michael Seals, Intersil Address 2401 Palm Bay Rd NE, Palm Bay, FL 32905 Voice: , FAX: , Abstract: This document highlights the actions taken by the IEEE WG during the July Plenary meeting in Vancouver, Canada Purpose: Liaison report Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P M. Seals, Intersil

2 TG2 Status This Week Continued comment resolution.
July 2002 TG2 Status This Week Continued comment resolution. AFH (adaptive frequency hopping) and EV3 (a packet type) sections of the draft were made informative. Seven “No” votes were converted to “Yes” giving approval rate of 75,8% in Four presentations were given in TGe to address concerns on AWMA (alternating wireless medium access). Next Steps Begin recirculation ballot in after this meeting. M. Seals, Intersil

3 July 2002 TG3 Status This Week Ballot Review Committee formed for comment resolution. Comment resolution on first recirculation ballot (LB 17) A new compromise on security was passed including RSA as an option. Next Steps Continue comment resolution Complete sponsor ballot pool selection Prepare a white paper on coexistence based on Annex D of the draft M. Seals, Intersil

4 Comment resolution on second recirculation ballot (LB 18).
July 2002 TG4 Status This Week Comment resolution on second recirculation ballot (LB 18). All TRs addressed, about 400 editorial comments still open. Next Steps Begin third recirculation ballot. Anticipate sponsor ballot after September Meeting M. Seals, Intersil

5 July 2002 SG3a Status General This SG is exploring alternative PHYs to the 2.4 GHz PHY in the TG3 draft This Week Heard 8 proposals for UWB channel models. Continued work on the selection criteria document. Next Steps Continue refinement of the selection criteria and technical requirements. Conference calls to continue work on developing a UWB channel model. Conference calls to continue work on Selection Criteria. Progress is dependent upon the approval of the TG3 MAC. M. Seals, Intersil


Download ppt "July 2002 Project: IEEE P802.11 Working Group for Wireless Local Area Networks (WLANs) Submission Title: 802.15 Liaison Report, July 2002 Date Submitted:"

Similar presentations


Ads by Google