Presentation is loading. Please wait.

Presentation is loading. Please wait.

2017 MRL Working Group Activities Morgan/Stanley

Similar presentations


Presentation on theme: "2017 MRL Working Group Activities Morgan/Stanley"— Presentation transcript:

1 2017 MRL Working Group Activities Morgan/Stanley

2 2017 Activities Reviewed 2016 workshop results
MRL 1-3 ESH Survey – Very useful, two days instead of one! Discussed Environmental, Safety, and Health concerns How to add requirements to MRL BOK? Directly to criteria? Included in Deskbook as a best practice Other? 2017 workshop item for review MRL 1-4 Some empty MRL 1-3 criteria filled where it makes sense MRL 4 changes to flow with MRL 1-3 changes AS6500 incorporated in MRL Deskbook

3 2017 Activities Users guide updates
Pivot tables for reporting Ease of use Barry leaving MRL WG for VT OSD Manufacturing and quality roles Define the manufacturing management activities conducted by the government program management offices Swim lanes Reviewed Available Training AFRL, AFIT, DCMA, Industry Some available on website ( Reviewed new AFRL MRL Tool DOCENT (also at ww.dodmrl.com) Planning DMC Sessions Please join us!

4 2017 Activities DMC Agenda Day 1 (Tuesday, 5 December 2017) MRL Training section 1 Lastoskie 90 min AS6500 Training section 2 Karr 90 min Day 2 (Wednesday, 6 December 2017) OSD Manufacturing Perspective Mr. Gold 30 min MRL WG Activities Morgan 30 min MRL/AS6500 integration Karr 30 min MRL Assessment Tool Mazrimas 30 min Industry Case study Shubrooks/Raytheon 30 min Industry Case study Schmidt/Boeing 30 min


Download ppt "2017 MRL Working Group Activities Morgan/Stanley"

Similar presentations


Ads by Google