Presentation is loading. Please wait.

Presentation is loading. Please wait.

TGz Closing Report Date: Authors: September 2007 Month Year

Similar presentations


Presentation on theme: "TGz Closing Report Date: Authors: September 2007 Month Year"— Presentation transcript:

1 TGz Closing Report Date: 2007-09-20 Authors: September 2007 Month Year
doc.: IEEE yy/xxxxr0 September 2007 TGz Closing Report Date: Authors: Menzo Wentink (Conexant) John Doe, Some Company

2 Month Year doc.: IEEE yy/xxxxr0 September 2007 Abstract This submission provides the TGz closing report for the Hawaii meeting (Sep 07) of Menzo Wentink (Conexant) John Doe, Some Company

3 TGz Goals for Hawaii (Sep 07)
Month Year doc.: IEEE yy/xxxxr0 September 2007 TGz Goals for Hawaii (Sep 07) Hear presentations, discuss draft, process Menzo Wentink (Conexant) John Doe, Some Company

4 Accomplishments Appointed secretary: Daniel Borges (Apple)
Month Year doc.: IEEE yy/xxxxr0 September 2007 Accomplishments Appointed secretary: Daniel Borges (Apple) Heard presentations Discussed and refined draft text document Determined further work to be done Menzo Wentink (Conexant) John Doe, Some Company

5 Submissions 11-07-2515-04-0dls-tunneled-direct-link-setup.doc
Month Year doc.: IEEE yy/xxxxr0 September 2007 Submissions dls-tunneled-direct-link-setup.doc dls-tunneled-direct-link-setup.doc dls-tunneled-direct-link-setup.doc dls-fair-and-protected-dls.ppt dls-tunneled-direct-link-setup.doc dls-enhanced-direct-link-setup.ppt Menzo Wentink (Conexant) John Doe, Some Company

6 Output Documents 11-07-2514-03-0dls-tgz-september-2007-agenda.ppt
Month Year doc.: IEEE yy/xxxxr0 September 2007 Output Documents dls-tgz-september-2007-agenda.ppt dls-tgz-september-2007-agenda.ppt dls-tgz-september-2007-agenda.ppt dls-tgz-september-2007-agenda.ppt dls-san-francisco-minutes.doc dls-closing-report.ppt Menzo Wentink (Conexant) John Doe, Some Company

7 Teleconferences and Ad Hocs
Month Year doc.: IEEE yy/xxxxr0 September 2007 Teleconferences and Ad Hocs Teleconferences Oct 2, Oct 16, Oct 1 hour Time: 10am ET Menzo Wentink (Conexant) John Doe, Some Company

8 To Do until Atlanta 1 Security related Move DH out of FTIE into own IE
July 2007 doc.: IEEE yy/xxxxr0 September 2007 To Do until Atlanta 1 Security related Move DH out of FTIE into own IE Do the DH values need to be covered by the MIC? Authentication when the AP has no security PIN or passphrase type authentication Change the HMAC SHA-256 to TGr KDF Generate a key for the MIC Check TGu and TGv multi-SSID/same-BSSID. May have to add additional conditions to avoid different security configurations between peer STAs. Menzo Wentink (Conexant) Menzo Wentink, Conexant

9 To Do until Atlanta 2 Editorial General New features
July 2007 doc.: IEEE yy/xxxxr0 September 2007 To Do until Atlanta 2 Editorial AKM values to be assigned by ANA (table 34). General Can we use the 11i pre-auth Ethertype, or do we have to get a new one? New features Off-channel TDLS? Menzo Wentink (Conexant) Menzo Wentink, Conexant

10 To Do until Atlanta 3 Do we need conference calls?
July 2007 doc.: IEEE yy/xxxxr0 September 2007 To Do until Atlanta 3 Do we need conference calls? bi-weekly, Oct 2, Oct 16, Oct 30 1 hour Time: 10am ET The TGz reflector is up and running Send updated timeline to Stephen McCann Make call for editor at Hawaii plenary Menzo Wentink (Conexant) Menzo Wentink, Conexant

11 November Meeting Objectives
Month Year doc.: IEEE yy/xxxxr0 September 2007 November Meeting Objectives Continue text development based on To Do list Menzo Wentink (Conexant) John Doe, Some Company

12 Backup September 2007 Month Year doc.: IEEE 802.11-yy/xxxxr0
Menzo Wentink (Conexant) John Doe, Some Company

13 July 2007 doc.: IEEE yy/xxxxr0 September 2007 Motion 1 Move to approve the minutes from the San Francisco meeting – (in document 07/2203) Mover: Dave Hunter Seconder: Daniel Borges Result: Unanimous Menzo Wentink (Conexant) Menzo Wentink, Conexant

14 Motion 2 Move to appoint Daniel Borges as our permanent Secretary
July 2007 doc.: IEEE yy/xxxxr0 September 2007 Motion 2 Move to appoint Daniel Borges as our permanent Secretary Mover: Kain Seconder: Yasuhiko Inoue Result: Unanimous Menzo Wentink (Conexant) Menzo Wentink, Conexant

15 Motion 3 Move to have conference calls as follows:
July 2007 doc.: IEEE yy/xxxxr0 September 2007 Motion 3 Move to have conference calls as follows: Oct 2, Oct 16, Oct 1 hour Time: 10am ET Moved: Mike Montemurro Second: Henry Ptasinski Result: yes: unanimous Menzo Wentink (Conexant) Menzo Wentink, Conexant

16 TGz Timeline September 2007
January 2005 doc.: IEEE yy/xxxxr0 September 2007 TGz Timeline 6 months after Hawaii Initial Working Group Letter Ballot: March 08 6 Re-circulation Working Group Letter Ballot: September 08 3 Form Sponsor Ballot Pool: December 08 Initial Sponsor Ballot: March 09 2 Re-circulation Sponsor Ballot: May 09 Final WG Approval: July 09 Final EC Approval: September 09 RevCom/Standards Board Approval: December 09 IEEE Publish: February 10 Menzo Wentink (Conexant) Dorothy Stanley, Agere Systems


Download ppt "TGz Closing Report Date: Authors: September 2007 Month Year"

Similar presentations


Ads by Google