Download presentation
Presentation is loading. Please wait.
Published byBrianna Craig Modified over 6 years ago
1
Flood Forecasting and Warning Vienna Flood Model
Presentation to Town of Tillsonburg July 13, 2009 Heather Surette Manager of Watershed Services
2
Nanticoke Creek on Thompson Road February 12, 2009
Overview Background Role of Conservation Authority Vienna Flood Model History Approach Application Next Steps Summary Nanticoke Creek on Thompson Road February 12, 2009
3
History of Flooding October 1954 Hurricane Hazel passed into southern Ontario. 81 people died Damages estimated at $25 M ($180 M current dollars)
4
Flooding Contributing factors (e.g. ice jams, rainfall)
Major cause spring snowmelt ‘Flood plains’ or ‘flood hazard lands’ Flood plains managed to protect residents Occupied floodplains = risky business Vienna February 13, 2009
5
Flood Management Prevention (e.g. land use policies)
Protection (e.g. dams, dykes) Emergency Preparedness and Response Emergency response plans Mitigation strategies Specific hazard identification and response (e.g. floods) Vienna February 12, 2009
6
Role of Conservation Authorities (CAs)
Ontario Ministry of Natural Resources (MNR) and CAs are responsible for forecasting where and when flooding is likely to occur and issuing flood warnings. Monitor watershed conditions including snow conditions, precipitation and flows to aid in forecasting and warning. Advance warning of an impending flood allows municipalities to put emergency response plans into operation, and notifies the public of developing or ongoing unsafe river and lake conditions and allows individuals to take precautions. The purpose of the system is to minimize flood damage and loss of life.
7
Role of CA’s Conservation Authorities generally issue three different types of flood warnings: High Water Safety Bulletin Flood Advisory Flood Warning Sandusk Creek February 12, 2009
8
Flooding in LPRCA’s Watershed
Municipality of Bayham Winter/Spring 2008 Winter/Spring 2009 significant flooding No fatalities Minor damage Big Otter Creek near Port Burwell
9
Village of Vienna Located in Big Otter Creek watershed
Flooding in 2008/09 Infrastructure Sanitary sewers Roads Bridges Residences and business in flood plain
10
Vienna Flood Model History LPRCA and Bayham partnership
LPRCA Comprehensive Study Impact analysis Detailed mapping Effectiveness monitoring
11
Vienna Flood Model Approach Computer model to determine water levels
Simulation of flows and ice jams Statistical data analysis Army Corps of Engineers model
13
Vienna Flood Model Application Stages of flooding
Identification of vulnerable infrastructure Mapping Model application Model accuracy analysis Marking of bridges Information distributed to residents Development of partnerships
14
Flood Stages Mapped
15
Vienna Flood Model Next Steps
Defined agency roles and responsibilities Communication plan to improve interagency consultations Model upper reaches of Big Otter Creek Ongoing refinement Ice Jam Port Burwell February 12, 2009
16
Flooding at Bailey Bridge
Summary Improved communications between agencies Emergency response mitigation strategies Enhanced emergency management programs Enhanced profile of LPRCA-Municipal partnership Reduces potential for negative environmental impact Flooding at Bailey Bridge
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.