Download presentation
Presentation is loading. Please wait.
Published byΦιλομήνα Παπαντωνίου Modified over 6 years ago
1
Top 10 Things that Can and Do Go Wrong at the Department Level
FYAP May 6, 2014 FYAP ver. 05/14 © Florida State University. All rights reserved
2
Number One Failure to submit proposal to SRA for review and approval prior to submission to sponsor
3
Number Two Principal Investigators, Chairs and/or Deans sign and accept award on behalf of FSU
4
Number Three Failure to obtain Chair and Dean approval for cost sharing/matching commitments or requests for indirect costs waivers prior to submitting to SRA
5
Number Four Treating FSU faculty in proposal as a consultant
6
Number Five Expectation of receiving a salary increase simply because proposal included funds to cover an increase
7
Number Six Performing work and/or delivering the results to a sponsor prior to receiving an award
8
Number Seven Authorizing personnel without an appointment to work on a project
9
Number Eight Subcontracting out more than 50% of an award
10
Number Nine Making inappropriate charges to projects and untimely initiation of cost transfers
11
Number Ten Documenting or certifying an effort report without “a suitable means of verification” (i.e., first-hand knowledge) of work performance
12
Number Eleven Failure to satisfy and/or properly document cost sharing commitments
13
Number Twelve Nepotism – PI employing relatives on a project
14
Number Thirteen Relying on a program officer’s authorization for prior approvals required by terms of award
15
Questions
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.