Download presentation
Presentation is loading. Please wait.
1
Virgo Update – LSC meeting
News from Virgo B. Mours LIGO-G Z August 15, 2005 Virgo Update – LSC meeting
2
Virgo Update – LSC meeting
Virgo Recent Progress First lock in recycled configuration: October 2004 C5 run: December 2004; Recycled and “Recombined” modes 2005 Commissioning activities: Alignment: Drift controls using wavefront sensing now on all d.o.f. Automation Control upgrades, robustness (“jumps”), Noise hunting Summer shutdown preparation New “injection” (bench, PR mirror, ISYS alignment) Data analysis preparation Study C-run data Collaborative data analysis (LIGO-Virgo, Bar-Virgo) August 15, 2005 Virgo Update – LSC meeting
3
Sensitivity evolution
August 15, 2005 Virgo Update – LSC meeting
4
Virgo Update – LSC meeting
C6 run July 29 – August 13 Duty cycles: Locking: 89% Science mode: 86% August 15, 2005 Virgo Update – LSC meeting
5
Virgo compared to LIGO-S2
August 15, 2005 Virgo Update – LSC meeting
6
Virgo Update – LSC meeting
Next steps Sept-Dec 05: “Injection” shutdown 2-3 months of work New injection bench; Power should goes up by a factor 10 New recycled mirror: Better controls Miscellaneous changes Followed by the new injection system commissioning 2006: Commissioning + some commissioning runs Alignment, controls,… A science run by the end of 2006 (coincidence with LIGO-S5) ? 2007 Observation/Commissioning/Upgrade time 2008-9: Virgo + 50W laser, New electronic, New mirrors ? (not yet decided) 2011(?): Advanced Virgo 200W laser? New beam geometry? New mirrors?... August 15, 2005 Virgo Update – LSC meeting
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.