Presentation is loading. Please wait.

Presentation is loading. Please wait.

Virgo Update – LSC meeting

Similar presentations


Presentation on theme: "Virgo Update – LSC meeting"— Presentation transcript:

1 Virgo Update – LSC meeting
News from Virgo B. Mours LIGO-G Z August 15, 2005 Virgo Update – LSC meeting

2 Virgo Update – LSC meeting
Virgo Recent Progress First lock in recycled configuration: October 2004 C5 run: December 2004; Recycled and “Recombined” modes 2005 Commissioning activities: Alignment: Drift controls using wavefront sensing now on all d.o.f. Automation Control upgrades, robustness (“jumps”), Noise hunting Summer shutdown preparation New “injection” (bench, PR mirror, ISYS alignment) Data analysis preparation Study C-run data Collaborative data analysis (LIGO-Virgo, Bar-Virgo) August 15, 2005 Virgo Update – LSC meeting

3 Sensitivity evolution
August 15, 2005 Virgo Update – LSC meeting

4 Virgo Update – LSC meeting
C6 run July 29 – August 13 Duty cycles: Locking: 89% Science mode: 86% August 15, 2005 Virgo Update – LSC meeting

5 Virgo compared to LIGO-S2
August 15, 2005 Virgo Update – LSC meeting

6 Virgo Update – LSC meeting
Next steps Sept-Dec 05: “Injection” shutdown 2-3 months of work New injection bench;  Power should goes up by a factor 10 New recycled mirror:  Better controls Miscellaneous changes Followed by the new injection system commissioning 2006: Commissioning + some commissioning runs Alignment, controls,… A science run by the end of 2006 (coincidence with LIGO-S5) ? 2007 Observation/Commissioning/Upgrade time 2008-9: Virgo + 50W laser, New electronic, New mirrors ? (not yet decided) 2011(?): Advanced Virgo 200W laser? New beam geometry? New mirrors?... August 15, 2005 Virgo Update – LSC meeting


Download ppt "Virgo Update – LSC meeting"

Similar presentations


Ads by Google