1
Engineering Change Process
Implementation in eMatrix Ralf Virnich For internal usage only
2
Engineering Change process
Status Renewed YEL Procedure Processing Wiring Harness Engineering Changes EA-EN-WH-P-020 released in 04/2018 Clear definition about information flow and responsibilities Clear 2 Step approach: Evaluation & Implementation Defined Acronyms
3
Engineering Change process
Evaluation Phase - ECR Implementation Phase - ECO Released Drawing preparation Create ECO Detailing Release Approved ECR(s) Request Samples/Reports Drawing check ECO Plant feedback Complete ECO Supply Management Costing Manufacturing Logistic Approve Ready for release Request Detailing Design PTC
4
Engineering Change Process
Historical Issues CSC‘s have released individual „tailormade“ processes Various names for same documents throughout Europe (ECN, PCN, PCR, FAR, ECAI, IRL, PTCN....) Document Control (master, revisions, loss) Investigation phase only partialy completed Obsolete material / finished goods Deadstock Airfreight In plant change cost
5
Engineering Change Process
Goals One Process, One Tool, for all Ensure complete process flow Eliminate waste Same data, at the same time, everywhere All change related information in one place Total Change Cost overview
6
Engineering Change Process
eMatrix as Process and Data Management Solution
7
Engineering Change Process
Engineering Change Request ECR
8
Engineering Change Process
Feedback of Change Implication
9
Engineering Change Process
New Parts / Material Overview incl. Feedback from AP
10
Engineering Change Process
Storage of change related documents
11
Engineering Change Process
Clear overview about affected WH Parts
12
Engineering Change Process
Revision History of WH Parts
13
Engineering Change Process
Clear overview about affected WH Drawings
14
Engineering Change Process
Revision History of WH Drawings
15
Engineering Change Process
Relation between WH Parts and WH Drawings WH Part or Module in case of KSK WH Drawing 1 2 3 4 Here you see 4 regular drawing releases. The WH Part on the left side has a corresponding WH Drawing shown on the right side
16
Engineering Change Process
Relation between WH Parts and WH Drawings WH Part or Module in case of KSK WH Drawing Here you see that 2 WH Parts on the left side have no corresponding WH Drawings. Two times the WH Parts (Rev.4 and 5) havebeen re vised without changing the WH Drawing.
17
Engineering Change Process
Relation between WH Parts and WH Drawings WH Part or Module in case of KSK WH Drawing Only with the last release WH Part (Rev.6) a nd WH Drawing (Rev.4) have been for malized again.
18
Engineering Change Process
Print Clarifications
19
Engineering Change Process
Help function and manuals
20
Engineering Change Process
Search function
21
Thank you very much for your attention!