Download presentation
Presentation is loading. Please wait.
1
Technical Co-operation Challenges
Why ? Capabilities of existing Brazilian Institutions
2
Technical co-operation from Brazil ?
Experience in training foreign Aviation personnel - since 1980 Participants nominated to almost every Panel, Committee, Study Group established by ICAO TRAINAIR Member Most air traffic flows in the Region affect Brazilian airspace
3
Institutes ready for technical co-operation
Civil Aviation Institute - IAC Institute of Aeronautical Cartography - ICA Institute of Air Navigation Services - IPV
4
Technical co-operation fields (Group Training)
GNSS operations CNS/ATM concepts CNS/ATM senior management Procedures of Air Navigation (OPS & RAC)
5
Technical Co-operation (Assistance of Experts)
WGS-84 Aeronautical Charting Procedure construction (PANS-OPS) Training development (TRAINAIR method.) CNS/ATM master planning
6
CNS/ATM Challenges Aeronautical jobs survey
Technology insertion - Impacts on staffing, for example: implementation of RVSM = increase of Air Traffic Controllers (by 60 % ? )
7
ATM Challenges Case of Air Traffic Flow Management
- high degree of automation - global aspects - new function for Air Traffic Controllers - international co-operation is a must
8
Technical Co-operation
Needs Good deal Mechanisms Who pays for it
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.