US 50 SLOPE STABILIZATION PROJECT
NDOT # 3433 US 50 SLOPE STABILIZATION PROJECT GLENBROOK, NEVADA LAKE TAHOE
2
INTRODUCTION: US 50 SLOPE STABILIZATION WATER QUALITY PROJECT
WHAT IS A VRSS? HISTORY OF THE VRSS DESIGN LIFE - 80 YEAR CONSTRUCTION CONSIDERATIONS Q&A
3
DESIGN:
4
DESIGN:
5
DESIGN:
6
STEP # 1
7
STEP # 2
8
STEP # 3
9
STEP # 4
10
STEP # 5
11
STEP # 6
12
STEP # 7
13
CLEAR & GRUB SLOPES:
14
SLOPE EXCAVATION:
16
ANCHOR LAYOUT:
17
DRILLING:
19
GROUTING:
20
TESTING:
22
BENCHING THE SLOPE:
24
ANCHOR INSTALLATION COMPLETE:
25
VRSS CONSTRUCTION:
26
WALL ALIGNMENT:
27
BACKFILL:
28
ANCHOR / PIPE CONNECTION:
29
COCONUT / HYDROSEED MAT:
30
TELEBELT MATERIAL HANDLER:
31
LOTS OF STUFF:
32
STARTING TO CLIMB:
34
TOUGH ACCESS:
35
SLOPE DRAIN:
37
MICRO-TERRACE TIE-IN:
38
FINISHED SLOPE:
41
CONSTRUCTABILITY / LESSONS LEARNED:
1.) ACCESS / SAFETY 2.) HEIGHT OF SLOPE 3.) BENCHING MATERIAL / WIDTH 4.) SOIL TYPE 5.) TESTING FREQUENCY / SCHEDULE 6.) MATERIAL SELECTION
42
Q & A: