Download presentation
Presentation is loading. Please wait.
1
Marlinespike Seamanship
NOMENCLATURE Line vs. Rope Marlinespike Bitter End Standing Part Working End Bight Turn Round Turn Paragraph 1 1
2
Types ROPE WEAVE Nylon Three Strand Polyester Polypropylene Braided 2
Paragraph 2 2
3
Cleat Hitch Take a 3/4 turn under the horn away from the load
Lead the free end over and under the opposite horn Lead the free end over and under the other horn Tuck the free end under the last turn Paragraph 3 3
4
Bowline Form an overhand loop Feed the free end through the loop
Feed the free end around the standing part Feed the free end into the loop Paragraph 4 4
5
Coiling Start by lacing line over your hand
Form generous loops until line is coiled Make two turns around coil Feed working end through coil Paragraph 5 5
6
End Chapter 4 Paragraph 6 6
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.