Download presentation
Presentation is loading. Please wait.
Published byJames Higgins Modified over 6 years ago
1
Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis
Project Plan Review AAE 451: Team 2 Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew Rodenbeck Jason Tang Joe Taylor Tyler Wilhelm
2
Task Assignments Aerodynamics Propulsion Structures
Jeff Haddin James Kobyra Kathleen Mondino Propulsion John McKinnis Andrew Rodenbeck Structures Michael Caldwell Jason Tang Joe Taylor Dynamics & Controls Asif Hossain Tyler Wilhelm Leader: Tyler Wilhelm Co-Leader: Kathleen Mondino CFO: John McKinnis
3
Scheduler
4
Group Meetings Regular Team Meetings Subgroup Meetings
Mon. 6-9 PM Wed. 6-9 PM Sat. 9-? AM (When Necessary) Subgroup Meetings Scheduled on own time outside of regular team meetings Meeting Locations Reserved Classroom in Grissom Meredith Hall Conference Rooms
5
Group Meetings Work one design review ahead Presentations
Must be prepared before the Regular Team Meetings the night before the presentation is due Will be reviewed by all team members at Regular Team Meetings Run through at Regular Team Meetings
6
Website
7
Team Milestones Thiokol Final Design Report Draft
Thu. March 3 – Subgroups submit parts Sat. March 5 – Assemble Mon. March 7 – 1st Draft Wed. March 9 – Final Draft Week of Mon. March 7 – Freeze Design Mon. March 7 – Submit Parts Acquisition List
8
Team Milestones Sun. March 19 – Build & Test Plan
Testing (March 24 – April 14) Glide Test Drop Test Robustness Testing Thur. March 24 – Ready to Mill Thiokol Final Design Report Sat. April 23 – 1st Draft Mon. April 25 – Final Draft Summary Project Presentation Mon. April 25 – 1st Draft Wed. April 27 – Final Draft & Run Through
9
Calendar
10
Calendar
11
Calendar
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.