Download presentation
Presentation is loading. Please wait.
Published byMartin Doyle Modified over 6 years ago
1
Shovel Move 2011 Team Work What happens when things go right.
2
How do you move an 800 ton shovel ???
3
Coordinating : Contractors, Maintenance, Safety, and Production.
4
Technology is needed.
5
We’re on the move
6
Making sure it fits
7
Crossing the overpass at hwy. 101
8
Of course it attracted onlookers.
9
Some wire had to be raised in order to allow access.
10
Going down the hall road with escorts. A blistering speed of 5kmph.
11
Negotiating the slope at the langmuir crossing.
12
On the home stretch.
13
Coming down the hill at the Porcupine river crossing
14
Even the biggest floats sometimes need a little help.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.