FourStar 4K x 4K JHK imager
2
FourStar Internals 95% done
Camera & window optics are mounted in cells Photo credit: David Murphy 12/7/2018 FourStar
3
FourStar Optics ready to install 12/7/2018 FourStar
4
FourStar All Mylar and MLI installed 12 of 16 temp sensors installed
Greg Ortiz works on the rack (photo credit: David Murphy) 12/7/2018 FourStar
5
FourStar Half the controller systems installed
6
FourStar All focal plane mechanisms installed and tested warm using alignment telescope and reflecting targets 12/7/2018 FourStar
7
FourStar Warm alignments completed: Detector dewar
Field flattener wheel Camera module Radiation shield To be done: Detector module 12/7/2018 FourStar
8
FourStar Detectors 3 of 4 miss the readnoise spec: 30 e- vs 20 e-
Working with Teledyne to resolve the issue 12/7/2018 FourStar
9
FourStar Electronics Racks are complete
Process controller is not. This monitors thermistors, vacuum, LN2 levels, and controls LN2 autofill 12/7/2018 FourStar
10
FourStar Data system computers Tested using laboratory test dewar
Media: USB2 disks for science data and Blu-Ray for engineering data 12/7/2018 FourStar
11
FourStar Control software 95% done: motors, temperatures
Waiting on process controller completion 12/7/2018 FourStar
12
FourStar Data acquisition & pipeline software
“Dan Kelson’s working on it” 12/7/2018 FourStar
13
FourStar Schedule First cooldown week of March 23, 2009
Postdoc arrives in June 2009 Several cold alignment cooldowns to follow; each takes a month Ship to LCO in 2010A 12/7/2018 FourStar