Download presentation
Presentation is loading. Please wait.
1
“Fold-and-Go” Legends: Overall Status:
Key achievements in the last three weeks [2/11-3/3] Completed CAE analysis (3/2) Prototype Fabrication (3/3) - Coped all tubing - Milled all brackets - Turned, drilled and tapped axels - Located and tack welded components - Installed wheels Project Metrics Status Budget Schedule Communication Contribution Overall Status: O Project milestones Target date Expected completion Status CAE Analysis 02/22 Function Prototype 03/03 03/11 Material Testing 03/31 Key actions planned for the next two weeks Complete first functional prototype* Get access to material testing machine Mock up components / fixture for testing Evaluate functional prototype Key Discussion Areas Prototype - How it was made - Unexpected setbacks - Modifications - Headset bearings - Brakes Individual tasks moving forward Key risks / issues / scope changes Unexpected fabrication time Modify location of brackets for packaging Need to look into headset bearing Major issues Some issues Satisfactory R Completed In Progress Legends: O G
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.