Traditional Processes
INPUT OUTPUT Process Lead Time Work-in-Process Transport Time Operation Time Setup Time Rework
2
Just-In-Time Improvement Methodology
INPUT OUTPUT Process Process Lead Time Work-in-Process Transport Time Operation Time Setup Time Rework
3
Lean Master Improvement Methodology
INPUT OUTPUT Process Process Lead Time Work-in-Process Transport Time Operation Time Setup Time Rework Time Traps (rocks) are reduced through the vigorous use of the Lean toolset, applied to the “worst” time trap until it is no longer the worst, then attacking the next “worst”, and so on until the process goals of reducing WIP (the “water”) and thus Process Lead Time are met.