Download presentation
Presentation is loading. Please wait.
Published byΤρυφωσα Βικελίδης Modified over 6 years ago
1
IEEE 802.1 OmniRAN TG July 2016 F2F Meeting San Diego, CA
Max Riegel, Nokia (TG Chair)
2
July 2016 F2F Meeting Venue: Meeting room: Sessions:
Manchester Grand Hyatt 1 Market Place San Diego, CA USA Information Tel: Meeting room: Mon, Tue, Wed, Thu: Hillcrest C Sessions: Mon, Mar 25th, 16:00-18:00 Tue, July 26th, 13:30-15:30 special session on 5G Tue, Mar 26th, 16:00-18:00 Wed, Mar 27th, 16:00-18:00 Thu, Mar 28th, 10:30-12:30
3
Agenda proposal for July 2016 F2F
Review of minutes Reports Review of 802.1CF-D0.1 editor’s draft Contributions addressing issues of 802.1CF–D0.1 Revised and new P802.1CF contributions Contributions proposing new content Plan for 802.1CF-D0.2 draft Bug fixes New content Timeline and plan for initial TG ballot Project planning Timeline External reviewers of 802.1CF-D0.2 Contributions to 5G SC Status report to IEEE 802 WGs AOB
4
July 2016 Agenda Graphics Mon 07/25 Tue 07/26 Wed 07/27 Thu 07/28
Fri 07/29 08:00 10:00 802 EC Opening WNG ARC PRIV ECSG Closing 10:30 12:30 802.1 Opening Plenary 802.11ARC 802.11/ Mid-week Plenaries OmniRAN closing 802 EC Closing 13:30 14:00 15:30 OmniRAN special session on WP-5A/ RLAN approach for 5G SC 802.1 Closing Plenary 16:00 18:00 OmniRAN opening Joint 802.1/802.15 5G SC meeting
5
Participants, Patents, and Duty to Inform
All participants in this meeting have certain obligations under the IEEE-SA Patent Policy. Participants [Note: Quoted text excerpted from IEEE-SA Standards Board Bylaws subclause 6.2]: “Shall inform the IEEE (or cause the IEEE to be informed)” of the identity of each “holder of any potential Essential Patent Claims of which they are personally aware” if the claims are owned or controlled by the participant or the entity the participant is from, employed by, or otherwise represents “Should inform the IEEE (or cause the IEEE to be informed)” of the identity of “any other holders of potential Essential Patent Claims” (that is, third parties that are not affiliated with the participant, with the participant’s employer, or with anyone else that the participant is from or otherwise represents) The above does not apply if the patent claim is already the subject of an Accepted Letter of Assurance that applies to the proposed standard(s) under consideration by this group Early identification of holders of potential Essential Patent Claims is strongly encouraged No duty to perform a patent search
6
Patent Related Links All participants should be familiar with their obligations under the IEEE-SA Policies & Procedures for standards development. Patent Policy is stated in these sources: IEEE-SA Standards Boards Bylaws IEEE-SA Standards Board Operations Manual Material about the patent policy is available at If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at or visit This slide set is available at
7
Call for Potentially Essential Patents
If anyone in this meeting is personally aware of the holder of any patent claims that are potentially essential to implementation of the proposed standard(s) under consideration by this group and that are not already the subject of an Accepted Letter of Assurance: Either speak up now or Provide the chair of this group with the identity of the holder(s) of any and all such claims as soon as possible or Cause an LOA to be submitted
8
Other Guidelines for IEEE WG Meetings
All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. Don’t discuss the interpretation, validity, or essentiality of patents/patent claims. Don’t discuss specific license rates, terms, or conditions. Relative costs, including licensing costs of essential patent claims, of different technical approaches may be discussed in standards development meetings. Technical considerations remain primary focus Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets. Don’t discuss the status or substance of ongoing or threatened litigation. Don’t be silent if inappropriate topics are discussed … do formally object. See IEEE-SA Standards Board Operations Manual, clause and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more details.
9
Resources – URLs Link to IEEE Disclosure of Affiliation
September 2012 doc.: IEEE /0996r3 Resources – URLs Link to IEEE Disclosure of Affiliation Links to IEEE Antitrust Guidelines Link to IEEE Code of Ethics Link to IEEE Patent Policy Clint Chaplin, Chair (Samsung)
10
Business #1 Call Meeting to Order Minutes taker: Roll Call
Chair called meeting to order at 16:04 Minutes taker: Wang Hao is taking notes. Roll Call Name Affiliation Max Riegel Nokia Networks Wang Hao Fujitsu Roger Marks EthAirNet Assoc. Yonggang Fang ZTETX Juan Carlos Zuniga SIGFOX
11
Call for Potentially Essential Patents
If anyone in this meeting is personally aware of the holder of any patent claims that are potentially essential to implementation of the proposed standard(s) under consideration by this group and that are not already the subject of an Accepted Letter of Assurance: Either speak up now or Provide the chair of this group with the identity of the holder(s) of any and all such claims as soon as possible or Cause an LOA to be submitted Nothing brought up.
12
Agenda for March 2016 F2F Review of minutes Reports
Review of 802.1CF-D0.1 editor’s draft Contributions addressing issues of 802.1CF–D0.1 Revised and new P802.1CF contributions Contributions proposing new content Plan for 802.1CF-D0.2 draft Bug fixes New content Timeline and plan for initial TG ballot Project planning Timeline External reviewers of 802.1CF-D0.2 Contributions to 5G SC Status report to IEEE 802 WGs AOB
13
Schedules Mon Tue Wed Thu Revised and new P802.1CF contributions
Tue Review of minutes Reports Review of 802.1CF-D0.1 editor’s draft Wed Pending: Association and Deassociation Pending : Authentication and trust establishment Thu Pending: Authorization, QoS, and policy control Plan for 802.1CF-D0.2 draft Bug fixes New content Timeline and plan for initial TG ballot Project planning Timeline External reviewers of 802.1CF-D0.2 Contributions to 5G SC Status report to IEEE 802 WGs AOB
14
Business #2 Revised and new P802.1CF contributions
Text proposal for section Network initialization, which was uploaded shortly after the last conference call, was reviewed and terminology was jointly cleaned up to align with the definitions introduced in the latest revision of the NRM. According to the agreement in the Budapest meeting, text for section Network instantiation was removed and the text ready for inclusion into of the next draft D0.2 was uploaded to mentor under Discussion about the future location of the text proposed for led to the conclusion to extend the scope of chapter 8 to ‘Network virtualization functions’ with subsections 8.1 Network instantiation’, 8.2 ‘SDN functional decomposition’ and 8.3 ‘Network Function Virtualization’
15
Business #3 Reports Status and plans 5G SC IEEE SDN Whitepaper Others
IEEE SDN Whitepaper Others …
16
Revised and new P802.1CF contributions, cont.
Business #4 Revised and new P802.1CF contributions, cont.
17
Business #5 Review of 802.1CF-D0.1 editor’s draft
Revised and new P802.1CF contributions, cont.
18
Revised and new P802.1CF contributions, cont.
Business #6 Revised and new P802.1CF contributions, cont. Pending: Association and Deassociation Pending : Authentication and trust establishment Pending: Authorization, QoS, and policy control
19
Business #7 Plan for 802.1CF-D0.2 draft Bug fixes New content
Timeline and plan for initial TG ballot
20
Status report to IEEE 802 WGs AOB
Business #8 Project planning Timeline External reviewers of 802.1CF-D0.2 September interim meeting location Plans for York Contributions to 5G SC Status report to IEEE 802 WGs AOB
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.