1 PCS Outlook PCS User Group 12th September 2018, Vienna

2 Timeline Presentation
PCS User Group 12th September 2018 2018 Nov/Dec PCS Major Release: PCS EC version deployed in production 2019 Apr PCS Minor Release: Rest of PCS EC developments

3 2019 TTR Pilots, Big Data integration, TAF-TSI roll-out, non-RU Applicant (?) 2020 Non-RU Applicant (?), Big Data integration, Capacity model TTR IT Landscape

4 PCS EC

5 Status report and implementation plan
PCS EC Status report and implementation plan Plans for the upcoming periods Specs, development, test, releases Autumn (September – October) 2018: Sprints preparing PCS EC testing 11th September PCS EC test meeting PaP specification & development NCA – RNE meeting (19th – 21st September 2018) PaP requirements November/December 2018: PCS Major Release with PCS EC version core (basic) functions Deploy is expected for the end of Nov/beginning of Dec January - April 2019: IM related developments in the RFC business Timetable comparison, Reports, dashboard, C-OSS views Patch releases and PCS Minor Release (test by the end of February) with the rest of PCS EC version Testing, PaP specification and development Autumn 2018 Testing, deployment Winter 2018 Development of the rest, deployment Spring 2019

6 Big Data integration

7 Big Data integration 2019 – 2021 developments
Step by step implementation RNE Big Data is also developed in the meantime Only point synchronization Primary Location Codes In 2019 location point synchronization from CRD via RNE Big Data. It’s a pre-condition for connecting PCS to other RNE IT applications (TCR, TIS, CIP). With connection to other RNE applications, it could be possible to have TCR information during the path request preparation (2019/20). When network model is ready in RNE Big Data and data is available, PCS infrastructure schema could be extended and ready for lines, sections, segments and mileage information (2020/21). Network model will enable the possibility to have space-time diagram in PCS for capacity (path, band, TCR) presentation, conflict resolution, etc. Lines, sections, segments, mileage information Network TCR info during the path request preparation TCRs

8 TTR Pilots

9 Map, TTR Pilot IT Board, Timeline, Features
TTR Pilots Map, TTR Pilot IT Board, Timeline, Features TTR Pilot IT Board has been established. : Initial definition of functional requirements by the Pilot Board : Documentation of the functional requirements by RNE : Evaluation of the requirements by the Pilot Board : Finalization of the functional requirements and implementation plan : Start of preparation of training materials : deadline for implementation of the new functionalities Pilots Based on the received requirements Rolling Planning process should be implemented, Catalogue Paths should be improved and reports should be added

10 TAF-TSI

11 Change management, roll-out in production, PCS & TIL
TAF-TSI Change management, roll-out in production, PCS & TIL TIL should be adapted to the new PCS EC schema (PCS IP version 6.0) Transition Integration Layer (TIL) 01 Changes & requirements accepted by SMO should be adapted in PCS and in TIL too These can be regular change requests or the consequences of the Sector Handbook review Regular change management 02 PCS TAF-TSI endpoint is planned to be released in production in November 2019 Roll-out 03

12 Non-RU Applicant

13 Non-RU Applicant Depends on the workload, the development is planned to be rolled-out with Major Release or 2020 Questions presented on the former meeting are closed (hopefully)

14 TTR IT Landscape

15 TTR IT Landscape 2024…

16 PaP requirements Current constraints regarding PaPs are written in CMS
Planned adjustments: RU is able to delete intermediate points from a Flex PaP, if that is not a protected border PaP selection is improved with a new step (wireframe) IM is able to edit/delete any kind of point in the Flex PaP C-OSS is able to edit feeder/outflow parts of the dossier without having an impact on the calendar IM is able to provide different offers for a PaP for the different days IM is able to make tailor-made offer for a PaP day (capacity handling issue) Timeline: Development is now First available for test by the mid of October Back to PCS EC