Emerging Challenges in
Pipelines
4
Introduction Pipelines Safest Mode Energy Efficient Cost Effective
Eco Friendly
5
दक्षिणी क्षेत्र पाइपलाइन
Indian Oil’s Pipelines Network Pipeline Length Capacity Product Pipelines 7950 KM 46.19 MMTPA Crude Pipelines 5301 KM 48.60 MMTPA Gas Pipelines 140 KM 9.5 MMSCMD Total 13391 KM दक्षिणी क्षेत्र पाइपलाइन
6
Emerging Challenges in Pipelines
7
Challenges during Execution Phase
Authorization/Approval of Pipeline Acquisition of Right of Way (RoW) Statutory Clearances Clearances/Permissions for Crossings Geo-Political Issues Contract Management
8
Authorization/Approval of Pipeline
Authorization Process by PNGRB Bidding Process - Detailed Feasibility Report Identification of Pipeline Route – Desktop Survey Timelines for Completion of Projects
9
Acquisition of Right of Way (RoW)
Deputation of Land Acquisition Officer cum Competent Authority by States Non-Availability of good quality Contractor/Survey Agency for Engineering Survey and Cadastral Survey Issue of Compensation : Which Act to Follow - Market Rate or Govt. Rate for Land? Increased Public Awareness
10
Statutory Clearances Absence of Single Window No Firm Timelines
Rule Book differs from State to State Lackadaisical Approach by Government
11
Geo-Political Issues Political Interference at Local Level
Protests/ Dharnas by NGOs, Environmentalist, Activist, Farmers Threat from Locals of sabotaging the Projects Inherent Local Political Issues in the Project Execution State Problems due to Federal Structure
12
Contract Management Issues
Few contractors with proven track records Competition to grab the work Project Manager – Lack of Skill & Training Implementation of Penal Provisions in Contract Deployment of Resources for Project Execution
13
Challenges during Operations Phase
RoW Management Integrity Management of Pipelines Safety of Pipelines Product Specifications Aging Assets
14
RoW Management Rapid Urbanization Illegal/Unauthorized Mining in RoW
Surveillance of RoW Third Party Activities Natural Calamities
15
Integrity Management of Pipelines
Internal & External Corrosion in Pipelines; Microbial Corrosion AC/DC Interference from HT/LT Power Lines Coating Raw Material and its Application Pipelines in Common Corridor Material and Manufacturing Defects in Pipes
16
Safety of Pipelines Third Party Activities Natural Calamities
Pigging in Pipelines Lack of Support of State Authority Pipelines in Urban Areas
17
Product Specifications
Transportation of BS-IV/BS-VI Grade Products Multi Product Pipelines vs Single Product Pipeline Pipeline Compatible Products Phasing Out of SKO Availability of the Required Batch Lengths Interface Management
18
Aging Assets Increasing Costs of Maintenance Availability of Spares
Loss in Productivity Frequent Failures